_ _ _ _ _ - _ _ _ _ _ _
"MT ?!U?.f';p M'T-:MPCP.T..hhfd),.//Q964 s
BAKER & BOTTS oNs sMcut.cAzA MouSToN. TEXA5 77oo2 TELEP (713s 229-1234 TcLEx 76 2779 WASHINGTON OFFICC TELECOM MUNICATION 170s *C N N s VLV ANI A AV C., N. W.
WA*,MINGTON. 4 C. 2OOO6
.9 (7131229-Ist3 MousTON 9
(to2:4sr.ssai.asminstem. o. c.
N d,.[p "
11 tcLepMcNc itoa 4s7-sseo
[
June 25, 1981 gi
- 5 JUL 011981 =
.. ' ' TJ." L;;"ll ~ "' ;/r be D
Sheldon J. Wolfe, EsqV hCh ] %
g si, Atomic Safety and Licens~
4 Board Panel CCEN U.S. Nuclear Regulatory Commission
- ' C 3
Washington, D.C.
20555
[
\\
JunggOb>-)?
~
Offi Dr. E. Leonard Cheatum thh8C',ge/
9
,f Route 3, Box 350A Watkinsville, Georgia 30677 En :3 Cy S
Mr. Gustave A. Linenberger Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Members of the Board:
Enclosed herewith is a list of the contentions and the Board questions that are to be addressed in August and September.
Very truly yours,
. Gregory Copeland Attorney for Houston Lighting & Power Cumpany JGC:192 Enclosure /
cc:
All parties (w/ enclosure) e$
9 *$ n 1
8107 02 017 p.
G
~
~
~
Sch dulo for Filing of Tootimony on Remaining ContGntionc I.
Hearing Date:
August 17-28 Filing Date:
July 20 (Applicant)
July 27 (Staff & Intervenors)
Contentions:
ATWS Doherty 8 Blockage of intake canal Doherty 29 Chlorine monitoring McCorkle 9 ECCS vaporization rate Doherty 32 Noncendensible gaser TexPirg AC 53 Outside containment sampling TexPirg AC 52 Part 100 releases (TMI)
Doherty 40 Pipeline rupture / LPG Bishop 6 Position indication for SRV Doherty 42 Post-accident monitoring TexPirg AC 28 Rapid depressurization/ steam break TexPirg AC 55 Reactor pressure limit / relief valves TexPirg AC 41 Reactor water level indicators Doherty 41 Doherty 17 SRV reliability Stud bolt Doherty 26
- TNT detonation Bishop 17 Technical qualifications TexPirg AC 31 i
Board Questions:
H BQ 3 ATWS Combustible gas control BQ 4A RER' single failure BQ 6 Soil mechanics BQ 8 i
Drywell testing BQ 10 Pipeline rupture / LPG BQ 12 Non-safety grade equipment BQ 17 II.
Hearing Date:
September 14-24 Filing Date:
August 25 (Applicant, Staff and Intervenors)
Contentions:
Financial. qualifications Baker 1 Schuessler 6 Emergency planning
- i
- /
Staff will also file testimony on population projections in connection with its evidence on this issue.
..;,,., m. ~,..
a