ML20005A492
| ML20005A492 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/27/1981 |
| From: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Snyder G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20005A486 | List: |
| References | |
| NUDOCS 8106300392 | |
| Download: ML20005A492 (3) | |
Text
l PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 1881 19C1 PHILADELPHIA. PA.19101 1215 841-500:
seu stos t. o ALTaop, ELa c*
o ose April 27, 1981 Docket Nos. 50-277 50-278 Inspection No. 50-277/81-01 50-278/81-01 Mr. Gary Snyder, Chief Emergency Preparedness and Program Support Branch Re gion 1 U.S.
Nuclear Regulatory Comm'.ssion 631 Park Avenue King of Prussia, PA 19406
Dear Mr. Snyder:
Your letter of April 3, 1981, forwarded combined Inspection Report Nos. 50-277/81-01 and 50-278/81-01.
Appendix A addresses one item which does not appear to be in full compliance with Nuclear Regulatory Commission requirements.
This item is categorized as a Se verity Level V Violation in accordance with your Interim Enforcement Policy, 45FR 66754 (October 7, 1980),
and is restated below with our response.
NONCOMPLIANCE Section 6.8.1 of the Technical Specifications requires that procedures shall be established, implemented, and maintained that meet the requirements of Appendix 'A" o f USNRC Re gulatory Guide 1.33.
Section 6.8.2 of the Technical Specifications requires that each procedu e required by Section 6.8.1 of the Technical Specifications b.
sviewed by the PORC and approved by the Station Superinte-anc prior to implementation... Regulatory Guide 1.33 requirms procedures for both the operation and calibration of instrumentation used for radioactive effluent analyses.
Contrary to the above, as of January 15, 1981, the written procedure for the calibration of the computer based gamma spectroscopy system used for effluent analyses, was not reviewed P00R BRIGINM
""~ nz q
Mr.
G.
Snyder Page 2 and approved as required by Sections 6.8.1 and 6.8.2 of the Technical Specifications.
This is a Se verity Level V Violation (Supplement I).
RESPONSE
The procedures utilized for calibration of the computer based gamma spectroscopy system used for radioactive effluent analysis have been reviewed by PORC and approved without comment.
Very truly yours,
/
/
~ ;,q' a.y
/,
e e
G G
1 1
1 P00R ORIGINAL
COMMONWEALTH OF PENNSYLVANIA :
ss.
COUNTY OF PHILADELPHIA S. L.
Daltroff, being first duly sworn, deposes and says:
That he is Vice President of Philadelphia Electric Company; that he has read the foregoing response to Inspection Report Nos. 50-277/81-01 and 50-278/81-01 and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.
,T 7,., g,gt W4.....,.
Subscribed and sworn to thish day before me of 3
I
.0
' iot M Publip ELIZAB H. BOYEp
.atsty Publi Phila.. Phila.
Expires Jan. 30L 1982 P00R ORIGINAL
!