ML20005A361

From kanterella
Jump to navigation Jump to search
Forwards LERs 81-018/03L-0 & 81-020/03L-0
Date released: 01/19/2020 Download: ML20005A361


LER 81-020/03L-0:on 810530,RCS Leakage Test Had Not Been Performed within Time Interval Specified by Tech Specs. Caused by Personnel Error.Supervisory Personnel Have Been Instructed to Insure That Tests Are Performed
ML20005A364
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/24/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20005A364 (1)
LER 81-018/03L-0:on 810602,while Performing Steam Generator 2C FT-495 Loop calibr,FT495 Instrumentation Loop Was Declared Inoperable.Caused by Faulty Comparator Card.Card Was Replaced
ML20005A363
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/02/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20005A363 (1)
Forwards LERs 81-018/03L-0 & 81-020/03L-0
ML20005A360
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/24/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20005A360 (1)