ML20005A244
| ML20005A244 | |
| Person / Time | |
|---|---|
| Issue date: | 05/21/1981 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20005A241 | List: |
| References | |
| REF-QA-99900524 NUDOCS 8106300095 | |
| Download: ML20005A244 (1) | |
Text
_
i O
Gibbs and Hill Incorporated Docket No. 99900524/81-02 NOTICE OF NONCONFORMANCE Based on the results of an NRC inspection conducted on April 27 through May 1, 1981, it appears that certain of your activities were not conducted in accordance with NRC requirements.
NRC Letter of Acceptance of the Gibbs and Hill Topical Repc'rt, GIBSAR-17-A (Quality Assurance Program), states in part that, " Programmatic changes by Gibbs and Hill, Inc. to this Topical Report are to be submitted to NRC for review prior to implementation.
Organizational changes are to be submitted no later than 30 days after announcement."
Contrary to the above, programmatic and organizational changes made to the quality assurance program during the past year by Gibbs and Hill were not submitted to the NRC as required.
(See Details, paragraph C.3.a.)
I l
810630 0 096
.