ML20005A133
| ML20005A133 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/24/1981 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20005A134 | List: |
| References | |
| NUDOCS 8106290437 | |
| Download: ML20005A133 (1) | |
Text
,1 u., Aur.
$$ so"n"fss?r.'lt wiS DOCUMENT CONTAINS
^
POOR QURITY PAGES Post Ot' ice Box 264' a
i Birmmgham. Alabsma 35291 Telectione 205 783-6C81 F. L. Clayton. Jr.
S:L'C'7"'
Alabama Power ItM9 50uttyyn wxtrc Syster71 June 24, 1981 o t a.
50-347 f
b I
Docket No. 50-364 p
's
&s4/I Y
i Director, Nuclear Reactor Regulation
~
\\
U. S. Nuclear Pegulatory Comission Washington, D. C.
20555 Attention: Mr. B. J. Youngblood Gentlemen:
As required in the Alabama Power Company Full Power Operating License No. NPF-8 section 2.C(21)(g)(2), Alabama Power Company submits the attached results of the EPRI test report of the NNC Water Level Indicator testing following Unit 1 shutdown, November 7,1980.
If you have any questions, please advise.
Yours truly, 3 0 $$%
ns
(
F. L. Clayton,I Jr.
FLCJr/ JAR:de Attachment cc: Mr. R. A. Thomas Mr. G. F. Trowbridce Mr. J. P. O'Reilly Mr. J. O. Thoma (w/ attachment)
I Mr. W. H. Bradford oO 5
,h I
810 G 29 0 }
,