ML20005A133

From kanterella
Jump to navigation Jump to search
Forwards Tests of Water Level Indicator at AL Power Co Farley One Nuclear Plant,Following Unit One Shutdown - 801107
ML20005A133
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/24/1981
From: Clayton F
ALABAMA POWER CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20005A134 List:
References
NUDOCS 8106290437
Download: ML20005A133 (1)


Text

,1 u., Aur.

$$ so"n"fss?r.'lt wiS DOCUMENT CONTAINS

^

POOR QURITY PAGES Post Ot' ice Box 264' a

i Birmmgham. Alabsma 35291 Telectione 205 783-6C81 F. L. Clayton. Jr.

S:L'C'7"'

Alabama Power ItM9 50uttyyn wxtrc Syster71 June 24, 1981 o t a.

50-347 f

b I

Docket No. 50-364 p

's

&s4/I Y

i Director, Nuclear Reactor Regulation

~

\\

U. S. Nuclear Pegulatory Comission Washington, D. C.

20555 Attention: Mr. B. J. Youngblood Gentlemen:

As required in the Alabama Power Company Full Power Operating License No. NPF-8 section 2.C(21)(g)(2), Alabama Power Company submits the attached results of the EPRI test report of the NNC Water Level Indicator testing following Unit 1 shutdown, November 7,1980.

If you have any questions, please advise.

Yours truly, 3 0 $$%

ns

(

F. L. Clayton,I Jr.

FLCJr/ JAR:de Attachment cc: Mr. R. A. Thomas Mr. G. F. Trowbridce Mr. J. P. O'Reilly Mr. J. O. Thoma (w/ attachment)

I Mr. W. H. Bradford oO 5

,h I

810 G 29 0 }

,