2y Washington Public Power Supply System A JOINT OPERATING AGENCY
$3 P. o, aos ese sooo osa. wasusmeron war mentano, wannamorow sessa Pwons (sos) 375.sooo Docket Nos: 50-460 May 22, 1981 G01-81-154 g
g 50-513 3_
Sc:@ N.
$Y #
5 a
-Q offca&
h Mr. R. H. Engelken, Director Nuclear Regulatory Commission N
Region V 1
Suite 202 Walnut Creek Plaza 1990 N. Caltfornia Beilevard
)
Walnut Creek, Californla 94596
Dear Mr. Engelken:
Subject:
SUPPLY SYSTEM NUCLEAR PROJECTS NOS.1/4 IE BULLETIN 80-21,._VALVEJ 0KES_ SUPPLIED BY MALCOLM FOUNDRY
Reference:
G01-81-030, letter, DW Mazur to RH Engelken, same subject, February 3, 1981.
)
Per the reference letter the Supply System indicated that all vendors supplying safety related valves have been contacted, and all but Babcock & Wilcox indicated that none had used Malcolm Foundry as a supplier of cast valve parts. The Supply System was to respond by May 22, 1981 with the B&W results.
B&W which was unable to complete the review earlier has now responded and states that none of the valves supplied to the WNP-1/4 Projects have yoke castings or parts by Malcolm Foundry.
This completes the Supply System response to NRC IE Bulletin 80-21.
f Very truly yours, i
/
D. W. Mazur j
Progrram Director, WNP-1/4
/.
LCO:moe s
<r m
\\
cc: UN McIntyre, UE&C-PA p
V Mani, UE&C-Site (803
~ ~ e,981s =
=
u.a.
V
%snlllY%
3gli G
ig[gh N' '
^
Bi-42 810629 0 fQ
.