. ~8
~
2000 Second Avenue d C"IS O n m #: r "=
June 24, 1981 EF2 - 53,882 h's
/
Mr. L.
L. Kintner 9
Division of Project Management II
,[I
~k Office of Nuclear Reactor Regulation S-
=A I1 M
U. S. Nuclear Regulatory Commission 2
~
AN 2 5198I m Washington, D.
C.
20555
~
F u.a. g, m ;f7 Q
Dear Mr. Kintner:
g
Reference:
Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341
Subject:
HFEB-1 and HFEB-2 Positions Detroit Edison's responses to these two positions are enclosed herein, dFEB '
Control Room Design Review HFEB identified five (5) open items in their position based upon systems and items not available for review during the April 27 - May 1, 1981 onsite control room design review.
Other open items and HEDs were resolved in Detroit Edison letter EF2 - 53,112 dated June 4, 1981 which contained Edison's commitments for correcting deficiencies.
Detroit Edison commits to (1) perform an evaluation of the followjen five items and submit findings, (2) propose corrective actions for NRC review and approval, (3) sub-mit a schedule for implementation, and (4) make available for NRC inspection and audit by HFEB or their designates.
These activities will be completed per the following schedule:
1.
HVAC System - August 1, 1981 2.
Procedures for Permanent Panel Modifications -
August 1, 1981 3.
Control Room Emergency Evacuation Alarm Signal -
October 15, 1981 l
d 8106360l 9s t
1 Mr. L.'L..Kintner-June'24,.1981' EF2 - 53,882 Page 2
- 4..' Process Computer Software
' August 1, 1982 5.
Fermi 2. Color. coding Scheme' Standard
. August'1, 1981 HFEB-2' Vessel Level Instrumentation' Recorder Please refer to Attachment 1.
Sincerely, 6
/
W.
F. Colbert Technical Director.
Enrico Fermi 2 WFC:jl
- cc:
Mr. B.
Little l
1 e
k V
5' e..-,
r EF2 - 53,882 HFEB - 2 Position II.K.3.27 Modification of Vessel Level Instrumentation Recorder Detroit Edison has intended to modify the scale on the-referenced recorder to show the Top of Active Fuel'as
.zero reference,.and will complete this modification
-before fue1~1oading.
All vessel level instrumentation in the, control room has been referenced to a common.
level - 'only a scale replacement - is being made.