ML20004F865

From kanterella
Jump to navigation Jump to search
Summary of 810415 Meeting W/Util in Port Gibson,Ms Re Util Organizational Structure & General Licensing Matters.Agenda & List of Attendees Encl
ML20004F865
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 06/16/1981
From: Martore J
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8106260050
Download: ML20004F865 (5)


Text

"

p ;n %,,fo.,

o UNITED STATES f

NUCLEAR REGULATORY COMMISS!ON

{ j n,

WASHING TON, D. C. 205%

  • i, f
  • w tg' 6

JUN

  • 61981 Docket Nos. 50-416 and 50-417 APPLICANTS: Mississippi Power & Light Company Middle South Energy, Inc.

South Mississippi Electric Power Association FACILITY:

Grand Gulf Nuclear Station, Units 1 and 2 SUBJ.CT:

SUMMARY

OF APRIL 15, 1981 MEETING E

15, 1981 members of the NRC staff met with the applicant, Mississippi On April Power & Light Company (MP&L), at the Grand Gulf site in Port Gibson, Mississippi to discuss the MPal organizational structure for operations and general licensing T50 staff also accomplished an aerial site overview to assess site matters.

surroundings and evacuation routes, and toured the Unit 1 containment, auxiliary building, and control room. The list of attendees is provided as Enclosure 1, and the igenda as Enclosure 2.

The meeting consisted of a discussion of the Grand Gulf licensing review schedule, with a focus on both the construction status and utility staffing to support start-up and operation. MP&L reiterated its coninitment to meeting its projected fuel load date of December 31, 1981, and senior management attention to nuclear activi-ties and staffing.

Based on a review of the Grand Gulf organization and construction status, the NRC indicated that it would continue to perform its OL review consistent with the applicant's construction and fuel load schedule.

W oseph Martore, Project Manager Licensing Branch No. 2 Division of Licensing

Enclosures:

As stated cc: See next page ikkhb b

l l

l 8106260 & Q

I'r. J. P. McGaughy Assistant Vice President - Nuclear Production

!S ssissippi Power & Light Company P. O. Box 1640 J ackson, Mississippi 39205 cc:

Robert E. licGenee, Esq.

Wise, Carter, Child, Steen & Caraway P. O. Box 651 Jackson, Mississippi 39205 Troy B. Conner, Jr., Esq.

Conner, Moore & Corber 1747 Pennsylva,nia Avenue, N. W.

Washington, D. C.

20006

!*r. Adrian Zaccaria, Project Engineer Grand Gulf Nuclear Station Bechtel Power Corporation Gaithe, sburg, Maryland 20760 Mr. Alan G. Wagner, Resident Inspector Route 2 Box 150 Port Gibson, Mississippi 39150 Mr. N. L. Stampley, Sr. Vice President Engineering, Production & Construction P.O. Box 1640 Jackson, Mississippi 39205 Mr. L. F. Dale fluclear Project Manager P.O. Box 1640 Jackson, Mississippi 39205 Mr. John Richardson P. O. Box 1640 J ackson,111ssi ssippi 39205 O

8 6

e 9

- - - -, - -. ~,

ENCLOSURE 1

- Grand Gulf Meeting _

April 15,1981 List of Attendees

~ NRC' MP&L

=

H. Denton D. Lutken J. Martore fl. Stampley R. Lewis, Region II G. Rogers A. Wagne, Region II J. Mc Gaughy-C. Mc Coy

-L. Dale

' T. Cloninger L. Mc Kay u

a e

4 e

l J

  • gem 8-4

SNCLOSURE 2-April 15,1"81 Meeting Agenda Ariel Site Overview Grand Gulf Overview Construction /Startup Status Operations Program and Organization Operator Staffing / Qualifications Programs Emergency Planning Concluding Discussion Plant Tour

[

O l

l f.

l..

e g-r, '

.-l

~. -. -.

o 2

MEETING

SUMMARY

DISTRIBUTION f

I. Speis Docket file NRC PDR W. Johnston Local POR J. Stolz NSIC S. Hanauer TERA W. Gammill TIC T. Murley LB#2 File F. Schroeder m

H. Denton 4

D. Skovnolt E. Case M. Ernst D. Eisenhut E

)

1 R. Baer R. Purple h

C. Berlinoir

[, $lhton 2,

JUN 2 319815 g

~

ch nc r F. Miraglia dEag,7 A. Thadani E. Adensam

\\\\

D. Tondi G. Lainas N

J. Kramer R. Vollmer D. Vassallo J. P. Knight P. Collins I.

Bosnak D. Ziemann F. Schauer R. E. Jackson NRC

Participants:

J. Martore Project Manager H. Denton Attorney, OELD J. Martore M. Service Ol&E (3)

R. Lewis, Region II ACRS (16)

A. Wagner. Region II R. Tedesco G. Lear S. Pawlicki i

V. Benaraya Z. Rosztoczy bcc:

Applicant W. Haass Service List D. Muller R. Ballard W. Regan R. Mattson P. Check

0. Parr F. Rosa Ipu W. Butler W. Kreger jgjgj

[f p;,,,f R. Houston T. Murphy I.. Rubenstein p