ML20004F829
| ML20004F829 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek, Cooper, Arkansas Nuclear, River Bend, Waterford, South Texas, Comanche Peak, Fort Calhoun, Fort Saint Vrain |
| Issue date: | 03/24/1981 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 8106220485 | |
| Download: ML20004F829 (1) | |
Text
( ~
v.
- ,t*
e b
Y UNITED STATES
,pa " soy,
'o, -
NUCLEAR REGULATORY COMMISSION k *,
', ' ~ "" "2/Udo 4
' 's Ys'oY2
'N,,,"; ; #
[,
March 24,1981' l
MEMOPRICUM FOR: Those Listed Below FRCM:
G. L. Madsen, Chief, Reactor Proejets Branch, RIV
SUBJECT:
IE INFORMATICN NOTICE ti0. 81-08 Subject IE Information Notice has been sent to the following listed licensees.
A copy of the letter and the IE Information Notice sent to each licensee is attached for your information.
Arkansas Power & Light Company Gulf States Utilities ANO-1 & 2 (50-313; 50-368)
River Bend (50-458; 50-459)
Nebraska Public Power District Houston Lighting & Power Ccepany Cooper Station (50-298)
South Texas (50-498; 50 499)
Omaha Public Power District Kansas Gas & Eiectric Ccmpany Ft. Calhoun Station (50-285)
Wolf Creek (STN 50 a82)
Public Service Company of Louisiana Power & Light Company Colorado Waterford-3 (50-382)
Fort St. Vrain (50-267)
Texas Utilities Generating Company Comanche Peak (50-445; 50-446) h$WGC$w G. L. Madsen, Chief, Reactor Projects Branch Attachments:
As stated DISTRIBUTION:
t-co IE/0MS g
N MPA/L0EB f [=)v k g[l*'
IE/RPRIB
~
D IE/ REB A
IE/SRSI App'O 81961
- 1 h)commeE I
MB
~
c l
81ce220frJ q
y..-
"f -
SSINS No.: 5835 Accession No.:
3011040272 IN 81-08 UNITED STATES NUCLEAR REGULATORY CCPMIS$IGN CFFICE OF INSPECT!CN AND ENFORCEMENT WASHING CN, D. C.
20555 IE Information Notice No. 81-08 Marc., 20, 1981 Page 1 of 1
.RE?ETITI'/E FAILURES OF LIMITCRC:UE OPERATCR SMB-a MOTCR-70-SHAFT XEY.
Gescristico of Circumstances:
Ouring normal surveillance testing of motor-cceratec valves at the Ceccer Nuclear Station, it was discovered that :ne RHR "3" 1cco succression pcci cooling incoard throttle valve '.ould not ccerate.
The valve cic not coerate beca~. the key between the motor pinien gear anc :ne motor shaft had failed.
The ocerator for the valve has been identified as being Limit:rcue Operator Mocal_SMB-a.
Analysis of the failed key revealec that a standarc ty:e 1010 steel key had been installed instead of tne required special type 1130 steel key.
Further review of the problem establisned that similar failures with me:Or-to-shaft keys had also taken place at the ?iigrim, Haten, and Fit::atrick nuclear pcwer facilities.
Limitorcue C5mpany has performed an evaluatica of the problem, and they have concluded that the preolem is c:nfined to ccerators having a :crcue rating in excess of ICO ft/lb.
The standard type 1010 steel possesses adequate strength to acccmmccate motor ccerators having a torque rating -hat is less than 100 ft/lb.
Recemmended.a tion for Holders of 0:erstina Licenses and Construction :ermits:
c It is recommended that licensees having Limitor ue Ccerator Mccel SMB-a insta11ec -in :neir facilities veri'y :nat :ne scecial tyce 3140 steel keys have toen usec.
This can be easily acc:molisned by performing a harcness check of tne to:Or-to-shaft keys curing :ne next scheculed surveillance testing.
No written resconse to this information actice is r?quitec.
!f you neec additional information with regarc to this subject, please c:ntact tne Director of :ne anorcoriate NRC Regional Office.
p ' g, y
~'
_y:
IE Information Notice No. Cl-08 Maren 20, 1981 LISTING OF RECENTLY ISSUED IE INFORMATICN NOTICE 5 Information Subject-Date Issued-To Notice No.
Issued 20-45 Potential. Failure of 12/17/20 All pressurf:sd water SWR 3ackuo Manual Scram reactor facilities with Capability an Operating License (CL)
Construe: Ton Permi: (CP) 31-01 Possible Failures of 1/16/S1 All pcwer reactor' facilities General Electric Type with an Ocerating License HFA Relays (CL) Construction Permit (CP) 31-02 Transcortation of 1/23/31 All Racicgracny licensees Radiograpny Devices 31-03 Checklist for Licensaes 2/12/31 All cwer reac ce Mak?ng Natifica:icns of facili-ies with an Significant Events in Ocerating License (OL) anc Accordance with Near-tarm Applicants 10 CFR Part 50.72 31-04 Cracking in Main Steam 2/27/31 All ;cwer reactor facil' f es Lines
~
witn an Operating Licanse (CL) or Construction ?ermit (C?)
31-06 Failure of ITE Mcdel 3/11/81 All pcwer reac:ce facilities K-600 Circuit dreaker witn an Operating License (OL) or Construction Permit (CP) 31-05 Degraded CC System at 3/13/El All pcwer reactor facili-ies Palisaces witn an Coersting License (CL) or Construction ?ermit (C?)
31-07, Potential Preolem with 3/15/31 All pcwer reactor
'datar-Soluole ? urge Dam facilities wi:n an Materials Usec Ouring Coerating License (OL)
Iner: Gas Welcing or Construction ?ermit (CP)
Enclosure
_