O r

O Metropolitan Edison Company Met-Ed GPU

~<=>c - -

Middletown, Pennsylvania 17057 Writer's Direct Dial Number June 12, 1981 L1L 180 Office of Nuclear Beactor Regulation Attn: John v. Stolz, Chief Operating Reactora Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island Muclear Station, Unit 1 (TMI-1)

Opurating License No. DPR-50 Docket No. 50-289 i

Environmental Qualification for Small Break LOCA The purpose of this letter is to confirm informatioit transmitted by telephone June 5 to June 11, 1981 for clarification of our submittal dated May 18, 1981 (L1L 161).

Sincerely,

. D.

kill Director, TMI-l HDH:CWS:1ma Enclosure cc:

R. Jacobs ed D. DiIanni D

N

~

\\

?

9 l

ll-hs,%

r S

W}

/

  • s'

~

hC{

lI m

S l

/

f 8106I80330 Metropolitan Edrson Company is a Member of the General Public Utilities System

-~.

~

.u....

Enclorura L1L 180 Question: What radiation levuls are expected in the vicinity of Valves DH-V-4A/B and DH-V-5A/B during normal operation and during DH System operation?

Answer:

General area dose rates in the vicinity of DH-V-4A/B and DH-V-5A/B are less than 100mr/ hour * (and usually much less than 100er/hr) during either normal operation or DH System operation. This is based on routine radiation surveys taken since TMI-1 began operation.

Question: Will GPU review the results of the Westinghouse tests on Reliance motors used on Limitorque actuators? Will GPU advise the NRC if these test resultu are applicable to TMI-1 and the effects, if any?

Answer:

All information that GPU has reviewed to date indicates that the Reliance motors used in TMI-l Limitorque actuators are qualified as specified in our 79-01B submittal.

GPU will. review and consnent to the NRC on the Westinghouse reports.after the NRC makes the reports available to GPU.

Question: Do the failures on Foxboro transmitters, described in test i

report T3-1068, affect the qualification of the TMI-l transmitters? Are these the same type of units?

7 Answer:

All units in this report continued to function up to 7.6 x 10 R.

This is orders of magnitude above the SB LOCA radiation' for TMI-1.

The TMI-l t'ransmitters are of the same type as these tested.

Question: When will the B & W Report " Evaluation of Aging of Class IE Controls and Instrumentation in B & W 177FA Scope of Supply" be completed?

i l

Answer:

B & W has stated that the report should be published by July 15, 1981.

L The report is being sponsored by the B & W Owners Group and its

(

publication is under control of B & W and the Owners Group.

l Question: Will all components that have exceeded their qualified life expectancy be replaced before Restart? Will a program to replace components, as needed, be in place by Restart?

e i

Answer:

Yes. The only such components identified to date are neoprene cover seal gaskets. In addition, a procedure will be implemented by

[

criticality to replace components as needed.

l

  • 100 mr/hr may be briefly exceeded for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following a shutdown involving a large crud burst.