ML20004D897
| ML20004D897 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 05/28/1981 |
| From: | Colbert W DETROIT EDISON CO. |
| To: | Kintner L NRC |
| References | |
| EF2-53-336, NUDOCS 8106100280 | |
| Download: ML20004D897 (2) | |
Text
,0 I
f.p o.a t
2000 Secoed Ave %e F
ass
==
esM @ ^
Dettort ft:rugan 48226
{-
Qg 6 es%,h (313) 237 6000 M
qJ eh.
May 28, 1981
,,)
EF2 - 53,336
- "4,1 Mr. L. L. Kintner U.S. Nuclear Regulatory Cocaission 7920 Norfolk Bethesda, Maryland 20014
Reference:
Enrico Fermi Atomic Power Plant - Unit 2
Subject:
Site Specific Earthquake - Structural Reassessment
Dear Mr. Kintner:
This is in response ':o the request for additional information from your Structural Engineering Branch which was telecopied to us on May 27, 1981.
The Seismic Category I structures and buried pipes and conduits have been structurally reassessed for the effec't of the site specifie earthquake.
In reference to LOCA stresses, the perti. tent information on original load combinations and respective stress components, including those due to LOCA, have been presented in Chapter 4 and in Appendices thereto of the reassessment report.
The three components of tue earthquake have been considered in the reassessment report. Two horizontal components have been considered to be acting simultaneously and the vertical component has been added thereto as an absolute sum or SRSS as appropriate.
Damping value of 7% has been considered in the reassessment work.
Tae damping value used is in accordance with Reg. Guide 1.61, since the Seismic Category I structures are of reinforced concrete con-struction and the structural elements are highly stressed for the site specific earthquake loading.
Boo'
.s
}D 8106100
~
o
..., - ~
a
- Mr.-L. L.'Kintn2r
- U.S. Nuclear Regulatory Commission May 28, 1981 EF2 - 53,336 Page 2 s
We have.not had to use the as-built-strengths of structures in justifying the adequacy of Seismic Category I structures and buried pipes and conduits as reassessed.
Yours truly,
/
W. F. Colbert Technical Director Enrico Fermi - Unit 2 Written by:
Y. N. Anand WFC/YNA:jr cc:
R.W. Barr E.R. Bosetti
, J.H. Casiglia F.E. Cregor E. Lusis J.W. Nunley W.M. Street A/C Division File Document Control L. Schuerman J. Honkala A. Wegele f
f
+
,