ML20004C893

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-0687/81-02 on 810316-20.No Noncompliance Noted.Major Areas Inspected:Facility Organization,Shipping & Receiving,Storage & Internal Control,Physical Inventory, Records & Repts.Details Withheld (Ref 10CFR2.790)
ML20004C893
Person / Time
Site: 07000687
Issue date: 04/17/1981
From: Bissett P, Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20004C890 List:
References
70-0687-81-02, 70-687-81-2, NUDOCS 8106080019
Download: ML20004C893 (1)


Text

.

O U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEt1ENT

~

REGION I Report No. 70-687/81-02 Docket No.70-687 License No. SNM-639 Safeguards Group I

Licensee: Union Carbide Corporation P.O. Box 324 Tuxedo, New York Facility Name:

Sterling Forest Research Center Inspection At: Tuxedo, New York Inspection Conducted: March 16-20, 1981 Date of Last Material Control and Accounting Inspection:

April 27,1979 Type of Inspection:

Unannounced Material Control and Accounting Inspection Inspectors:

//#2)(

/

f/

W. Biss6tt, Safeguards Auditor dpte signed Approved by:

to M g

4//7/4'/

Ja sH.Joynerf/Act'phgChief date si'gned erial ControY and Accountability Section Inspection Summary:

Areas Inspected:

Facility Organization, Facility Operation, Shipping and Receiving, Storage and Internal Control, ID and Associated LEID, Physical Inventory, and Records and Reports.

The inspection involved 28 inspector hours onsite by one regional based inspector and was begun during the regular hours.

Resul ts: The licensee was found to be in compliance with NRC requirements in the seven areas examined during the inspection.

8106080Of

-