ML20004C838
| ML20004C838 | |
| Person / Time | |
|---|---|
| Site: | Bailly |
| Issue date: | 05/21/1981 |
| From: | Armin H, Derriggreen M AFFILIATION NOT ASSIGNED |
| To: | Hendrie J NRC COMMISSION (OCM) |
| References | |
| NUDOCS 8106050475 | |
| Download: ML20004C838 (2) | |
Text
cc:" T ::'X:r' e.r a cu_ r.=.Bc.9.1......
Chairman James Hendrie Nuclear Regulatory Commission Washington, D. C.
20555
Dear Chairman Hendrie:
l DO NOT ALLOW BUILDING OF THE BAILLY NUCLEAR PLANT!
It is contemptuous to disregard the advise of your regional director, James G. Keppler who made public a letter to your office.
It stated "THE BAILLY SITE HAS FAILED ALL EIGHT NRC SITING AND POPULATION CRITERIA."
Bailly is located next to Gary and within 30 miles of Chicago, It is immediately next to the huge new Bethlehem Steel Plant.
It is adjacent to the Indiana Dunes National Lakeshore..
4
~
/
It sits only:
co m 1,000 feet from six oil tanks with a 31 million
/Il U"
h em,.ng$6i
- T gallon capacity, MAY 21 400 feet from a 450,000 gallon feul oil tank, m W 200 feet from a 16 inch natural gas pipeline and X
Lx.r e t.M5 150 feet from a 10-inch gas pipeline.
3 - 4f*%
I;2/, hfhc,~"f,
'"i A fire in any of these installations v,o uld necessitate
/gh~?
the immediate evacuation of the Bailly plant itself, W
resulting in a loss of control over the reactor.
. c] JU.'l0.rigg{
.2j Evacuation from that area is impossible.
d * *-uda u=usus
~!
The roads are narrow, winding with impossible egress.
E,j 7
Issuing a license whic1. endangers millions of people shews contempt for human life.
AXE THE BAILLY PI.AN"I'!
Sincerely
[ggy hd Namebii}UQfbERkl@- 225 Ly l
Address ggy j f f M pp City lisRS CA %'85 S l' 9lfa i
pf 99'l i
810605o M S t
l
~
/
n.=.=2..=.9c.16._
oc:m= =.,.
Chairman James Hendrie Nuclear Regulatory Commission Washington, D. C.
20555
Dear Chairman Hendrie:
l DO NOT ALLOW BUILDING OF THE BAILLY NUCLEAli PLANT!
l l
It is contemptuous to disregard the advise of your regional director, James G. Keppler who made public a letter to your office.
It stated I
"THE BAILLY SITE HAS FAILED ALL EIGHT NRC SITING AND POPULATION CRITERIA."
Bailly is located next to Gary and within 30 miles of Chicago, It is immediately next to the huge new Bethlehem Steel Plant.
It is adjacent to the Indiana Dunes National Lakeshore.
N It sits only:
1,000 feet from six oil tanks with a 31 million t
gallon capacity, 7
400 feet from a 450,000 gallon feul oil tank, un"ac 200 feet from a 16 inch natural gas pipeline and gg81
- 150 feet from a 10-inch gas pipeline.
M
~
-5
... e n s m etzt i /
'.'..,- A 'JcMCS A fire in any of these installations e uld necessitate 3
"'"bi 2 e
the immediate evacuation of the Bailly plant itself, Nt/
resulting in a loss of control over the reactor.
Ce 1
Evacuation from that ares is impossible.
The roads are narrow, winding with impossible egress.
h
'Q/,I g a license which endangers millions of people Ahs 97 4 mpt for human life.
Q4 C,.
I
!.47' T
.N HE BAILLY PLANT!
id D
M, e.
h Sincerely p
%h <b k,t i
Address
- I' b'
M"U y { 7' p }g c /d-g
/' k.
City g
,e
-