e hsU 'g'l p.o. sox 270 NORTHEAST UTIIJTIES

]i ' 4 17 xawocum m..e-1 3*."20"ZO-

/SgI HARTFORD. CONNECTICUT 06101

'e-)

A

..=..,,.%7?l"1. ~",

g g

L J

s s

N

/c. /l.-.

\\

May 29, 1981 Docket No. 50-245 A01650 Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.

20555

References:

(1)

D. G. Eisenhut letter to All BWR Licensees, dated April 10, 1981.

(2)

G. G. Sherwood letter to D. G. Eisenhut, dated April 30, 1981.

Gentlemen:

Millstone Nuclear Power Station, Unit No. 1 Safety Concerns Associated with Pipe Breaks

'in the BWR Scram System In Reference (1), Nor'.heast Nuclear Energy Company (NNECO) was requested to provide the NRC Staff, within 45 days of receipt of Reference (1), the following informations i

1.

A generic evaluation of the applicability of the indicated I

sequences of events in the report to the BWR plant design, t

an estimate of the probability of occurrence of such se-l quences, and the bases for these conclusions, 2.

A generic evaluation of the applicability of the indicated safety concerns and findings in the report relative to BWR plant construction, design, and operation and the bases for these conclusions, and 3.

A generic evaluation of the recommendations listed in the report discussing the degree to which the recommendations are being or have been implemented with bases why the recommendations should or should not be completely imple-mented on BWRs.

l i

li 8106 050 gjg

4'

.A e The above three (3) generic evaluations have been provided to the NRC Staff by General Electric (GE) in Reference (2). Therefore, NNECO hereby references GE's submittal to satisfy the 45-day requirements of Reference (1).

In addition, NNECO is continuing to evaluate the 120-day requirements of Reference (1) and intends to subruit the requested information within the specified time frame.

Should you have any questions, please feel free to contact us.

Very truly-yours, NORTHEAST NUCLEAR ENERGY COMPANY I

W. GV Counsil Senior Vice President N

By:

W. F. Fee Executive Vice President I

t I

STATE OF CONNECTICUT )

g> gp/

)

ss.

Berlin COUNTY OF IIARTFORD

)

Then_ personally appeared before me W. G. Counsil, who being duly,' sworn, did state that he is Senior Vice. President of Northeast Nuclear Energy Company, a Licensee herein, that he is authorized to execute and file the foregoing information in the name and on behalf of the Licensees herein and that the statements contained in said information are true and correct to the best of his knowledge and belief.

. f,'l.' ' " ' ' ' ',,,. jp iffs fnV$

fjf g n, a&,

o

/

Notary Public

4) O O bgC, ')

j My Commission Expires March' 3f,1988

.A

'\\

,,., '.,,.4 i

t

' I y

r 3 -,,,.

s

'