ML20004C646
| ML20004C646 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 05/28/1981 |
| From: | Crouse R TOLEDO EDISON CO. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20004C647 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-3.D.3.4, TASK-TM 716, NUDOCS 8106040382 | |
| Download: ML20004C646 (1) | |
Text
..
-.y TOLEDO EDISON ACHARo P. CROUSE Near ~
Docket No. 50-3F iu mass.saa, License No. *.PF-3 Serial No. 716 p
May 28, 1981
{
'U 'o Q
4 O
Director of Nuclear Reactor Regulation U
/Sg k C/
~
Attention:
Mr. John F. Stolz Operating Reactor Branch No. 4
.(i.,
- %F j
Division of Operating Reactors s 'j -3 United Statcs Nuclear Regulatcry Cc==ission-
%,p ~ g -
Washingt ::, D.C.
20555
Dear Mr. Stolz:
This letter is to document a partial response to NUREG-0737, Clarification f
I,TMI Action Plan Requirements, for Davis-Besse Nuclear Power Station Unit 1 (DB-1).
Item III D.3.4 deals with Control Room Habitability Study.
The analysis shows that no substance stored on or offsite nor shipped on State Highway Route 2, a medium to heavily traveled highway adjacent to the westerly site boundary, will cause unacceptable hazards in the control room for a catastrophic failure of the storage or shipping container.
Very truly yours, C2 1
i RPC/ GAB: lab Enclosure cc: DB-1 NRC Resident Inspector
//
81060405?M f
THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43852 c