Responds to IE Bulletin 81-02, Failure of Gate Type Valves to Close Against Differential Pressure. Two Westinghouse Model 3GM88FN Valves Are Installed in Safety Injection Sys. Failure of Valves to Close Does Not Affect Safety Function
ML20004C547
Person / Time
Site: Beaver Valley
Issue date: 05/22/1981
From: Carey J
DUQUESNE LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-81-02, IEB-81-2, NUDOCS 8106040255
Download: ML20004C547 (3)


Text

,2.1 TW e m 4se.cooo Iu Y '

May 22, 1981 United States Nuclear Regulatory Commission N

Office of Inspection and Enforcement

,9

/ o),

k [h

'A Atta: Boyce H. Grier, Regional Director Region I dl 631 Park Avenue u,,,,l/g O s fgg7, King of Prussia, Pennsylvania 19406 7

Isikneer

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Q'g j,, \\ p IE Bulletin 81-02

/

Gentlemen:

We have reviewed IE Bulletin 81-02, " Failure of Gate Type Valves to Close Against Differential Pressure," as well as several Westinghouse letters concerning this subject. An investigation was performed and it was deter-mined that tuo (2) Westinghouse valves of the types identified in the Bulletin have been installed as replacements in,Beavet Valley Unit 1.

No Borg-Warner nor Anchor Darling valves of the types identified are installed at Unit.1 nor are any of the valve types mentioned in the Bulletin being maintained as spares at Unit 1.

The two (2) installed valves are Westinghouse Model 3GM88FN valves which are installed in t! e Safety Injection System and serve as the Boron Injection Tank (BIT) inlet isolation valves MOV-SI-867A and 867B. These valves are closed during normal operation and are used to isolate the BIT from the Charging and Volume Control System.

Although these valves are installed in the plant, they are not considered to pose a safety related operational problem as their function is to open upon initiation of safety injection. The valves are not required to close until after long-term safety injection is initiated.

It should be noted that the failure of these valves to close will not affect the long-term safety injection mode.

Failure of the valves to fully close after a safety injection would result in dilution of the boron concentration in the BIT and an increase in level in the Boron Injection Surge Tank. This dilution at Safety Injection termination would cause an operational inconvenienca but would not result in an incident with's'afety significance.

These valves may be required to close agcinst the High Head Charging Pump pressure (approximately 2500 psi). During l

recovery from an inadvertent safety injection, howev2r, the full differential pressure is not experienced and therefore the valve will not exhibit a torque requirement beyond the capability of the motor operator.

\\

6 s

I 910604og55 W

- -, ~

-e-

a

., -.. s

. Beaver Valley Power Station,~ Unit No. 1-

.Dockec No. 50-334, License No. DPR-66' IE Bulletin 81-02.

Page '2-The valve vendor. performed a preservice functional: test on each of these valves which demonstrated that the valves met the operational acceptance criteria with an applied differential pressure of 3000 paid (on opening) and 2900 paid. (on closing) at both full voltage and 80 percent voltage applied to

~

the motor operator. These valves successfully met the acceptance criteria for both closing and opening and have performed satisfactorily throughout their.*

service history.-

Based on our evaluation, no unreviewed safety questions result.from the

~ installation of.the two - (2) BIT isolation valves as failure of the valves to completely close will not affect any existing safety function. :Since the safety of the plant has not been compromised by these valves, we do not intend to modify these valves.

Our estimate of the manpower expended in conducting the review and preparing this response is 60 manhours.

Since no corrective action will-be required as a' result of this Bulletin, no additional manpower will be.-

required for corrective action.

If you have any questions concerning this response, please contact my office.

Very.truly yours, J.

. Carey Vice President, Nuclear i

cc:

D. A. Beckman, Resident Inspector United States Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 i

United States Nuclear Regulatory Commission c/o Document Management Branch

-Washington, DC 20555 United States Nuclear Regulatory Commission Director, Office of Inspection and Enforcement Washington, DC 20555 f.

l l'

___ _ _ _ _, ~..

..a. l.,

c CCMM0tMEALTH OF PEfttlSYLVAtlIA) ss:

COUNTY OF BEAVER On t js Jc;2 x I day of @ i v

/9[/

before me

. % 2re'l, a Notary PubMc in and for said Commonwealth and'Cdunty, personally appe(red J. J.- Carey, who being duly sworn,' deposed, and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are-true and correct to the best of his knowledge, information and belief.

b, egmyar JUDITH D. ANTHONY, Notary PubHc thipoingport Borough, Saaver Co., Pa.

+

My Commission boires Dec. 12, 1983 1

T

ne'~

~g,

,. -,,..,,,