ML20004C539
| ML20004C539 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 05/29/1981 |
| From: | Tauber H DETROIT EDISON CO. |
| To: | Tedesco R Office of Nuclear Reactor Regulation |
| References | |
| EF2-53-422, NUDOCS 8106040244 | |
| Download: ML20004C539 (1) | |
Text
.
+
3--
7 Harry Tauber -
[N[ c Cm.: v' 9
8
- 2000 Second Avenue
.y
- 2 M."
Detroit. %cmcan 48226 -
' J
- 7
- }t3J _(4;.N ;'D _ ["i't
. ;]l 2, y r w,,
(313) 237 8000
'j j\\ %' M F5 p,,~
'?'f
-g:
s h.#}-
May 29, 1981
' l 1.R J /
EF2 - 53,422 r
Mr. Robert-L._Tedesco Assistant Director for Licensing Division of' Licensing U._S.
Nuclear Regulatory Commission Washington,.D. C.
20555
Dear Mr..Tedesco:
Reference:
Enrico Fermi Atomic Power Plant,. Unit 2 NRC docket No. 50-341 Subj ect:
Compliance with 10CFR50',' Appendix-I,Section II.D - Cost-Benefit Analysis Detroit Edison has chosen-to comply:with 10CFR50, Appendix I, Section'II.D for Fermi 2 by choosing the option-of showing compliance with the design objectives of RM-50-2 as an optional met. icd of demonstrating compliance with-the cost-benefit analysis of.Section-II.D.
Tables 4.7'and 4.8 of NUREG-0769, " Craft Environmental Statement Related to the Operation of Enrico Fermi Atomic Power Plant, Unit No.
2" demonstrates compliance with the design objectives of Appendix I and RM-50-2, respectively.
Sincerely,
. -. (. <, -
i 4.
i cc:
Mr. B. Little Mr. L. L. Kintner 0
810604.0%
\\
. - -