ML20004C539

From kanterella
Jump to navigation Jump to search
Advises That Util Complies W/Design Objective of RM-50-2,as Optional Method of Demonstrating Compliance w/cost-benefit Analysis of App I,Section Ii.D
ML20004C539
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/29/1981
From: Tauber H
DETROIT EDISON CO.
To: Tedesco R
Office of Nuclear Reactor Regulation
References
EF2-53-422, NUDOCS 8106040244
Download: ML20004C539 (1)


Text

.

+

3--

7 Harry Tauber -

[N[ c Cm.: v' 9

8

- 2000 Second Avenue

.y

  • 2 M."

Detroit. %cmcan 48226 -

' J

7

- }t3J _(4;.N ;'D _ ["i't

. ;]l 2, y r w,,

(313) 237 8000

'j j\\  %' M F5 p,,~

'?'f

-g:

s h.#}-

May 29, 1981

' l 1.R J /

EF2 - 53,422 r

Mr. Robert-L._Tedesco Assistant Director for Licensing Division of' Licensing U._S.

Nuclear Regulatory Commission Washington,.D. C.

20555

Dear Mr..Tedesco:

Reference:

Enrico Fermi Atomic Power Plant,. Unit 2 NRC docket No. 50-341 Subj ect:

Compliance with 10CFR50',' Appendix-I,Section II.D - Cost-Benefit Analysis Detroit Edison has chosen-to comply:with 10CFR50, Appendix I, Section'II.D for Fermi 2 by choosing the option-of showing compliance with the design objectives of RM-50-2 as an optional met. icd of demonstrating compliance with-the cost-benefit analysis of.Section-II.D.

Tables 4.7'and 4.8 of NUREG-0769, " Craft Environmental Statement Related to the Operation of Enrico Fermi Atomic Power Plant, Unit No.

2" demonstrates compliance with the design objectives of Appendix I and RM-50-2, respectively.

Sincerely,

. -. (. <, -

i 4.

i cc:

Mr. B. Little Mr. L. L. Kintner 0

810604.0%

\\

. - -