ML20004C379

From kanterella
Jump to navigation Jump to search
Forwards Revised LER 79-005/03X-1.Detailed Event Analysis Encl
Date released: 01/18/2020 Download: ML20004C379


Revised LER 79-005/03X-1:on 790209,during Cold Shutdown, Diesel Generator 1A Output Circuit Breaker Did Not Close While Loss of Outside Electrical Power Test Was Performed. Caused by dried-out Breaker.Breaker Relubricated
ML20004C380
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/09/1981
From: Gahm J
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML20004C380 (1)
Forwards Revised LER 79-005/03X-1.Detailed Event Analysis Encl
ML20004C378
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/09/1981
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML20004C378 (5)