ML20004C321

From kanterella
Jump to navigation Jump to search

Notice of Issuance & Availability of Amend 85 to License DPR-57
ML20004C321
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/26/1981
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20004C319 List:
References
TAC-43822, TAC-43823, NUDOCS 8106030066
Download: ML20004C321 (2)


Text

_. -

)

(

u,'~')

7590 4

' UNITED STATES NUCLEAR REGULATORY COMMISSION ~

O_0CKET NO. 50-321 GEORGIA-POWER COMPANY, ETEAL.

' NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE.

The_ U. S. Nuclear Regulatory Commission'(the Commission) has issued

' Amendment No',,85 to Facility Operating License No. DPR-57 issued to Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric

- Authority o.f Georgia, and' City of Dalton, Georgia, which revised Technical Specifications for operation of the Edwin -I. Hatch Nuclear Plant _ Unit

'No.1, (the ' facility) located in Appling County, Georgia. The amendment is effective as of its date of issuance.-

The amendment revises the Technical Specifications by (1) adding two valves and two flanges to the list of containment isolation valves; and by (2) changing the setpoint for the Safety Relipf Valve tail pipe pressure switches.

The application for the amendment complies with the standards and

- requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made' appropriate.

findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Prior public notice of this amendment war. not required since the amendment does not involve a significant hazards consideration.

810.6 0 3 o Olo(o i

~

7590..

The Commission has determined that the issuance of this amendmentiwill' cnot result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4), and _ environmental impact statement or negative declaration and environmental-impact appraisal need not be prepared in connection with issuance:of this amendment.

- For-further details with respect to this action, see (1) the application

~

for amendment-dated May 4,1981,(2) Amendment No. 85 to License No'. DPR-57, and (3) the Commission's related Safety Evaluation. All of_these items

~

are available for public inspection at the Commission's Public Document Room,1717-H Street, N.W., Washington,1D.C., and at the Appling County Public Library,- 301 City Hall Drive, Baxley, Georgia 31513. A copy of items (2) and (3)'may be obtained upon request addressed to the U. S.

~

Nuclear Regulatory Commission, Washington, D.C.

20555, Attention:

Director, Division of Licensing.

Dated at Bethesda, Maryland, this 26th day of tiay 1981.

R THE NUCLEAR R LATORY COMMISSION f

L 7';

sc oh F. Stolz, Chief Op rating Reactors Branch #4 vision of Licensing i

l i

I e

t


.--u

- - -. - - - - - -