ML20004C098

From kanterella
Jump to navigation Jump to search
Forwards LER 81-028/03L-0
Date released: 01/18/2020 Download: ML20004C098


LER 81-028/03L-0:on 810423,accumulator 1B Was Declared Inoperable.Caused by Accumulator Being Initially Pressurized Too Close to Alarm Setpoint.Accumulator Vented & Returned to Svc.Personnel Reinstructed
ML20004C100
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/26/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20004C100 (2)
Forwards LER 81-028/03L-0
ML20004C097
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/26/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20004C097 (1)