ML20004B951

From kanterella
Jump to navigation Jump to search
Forwards Revised LER 80-045/01X-4
Date released: 01/18/2020 Download: ML20004B951


Updated LER 80-045/01X-4:on 800404,leak Rate Test Performed on Automatic Depressurization Sys Valves Revealed Unacceptable Leakage Rates.Probably Caused by Heat Damage from Installation Welding.Valves Will Be Replaced
ML20004B957
Person / Time
Site: Hatch 
Issue date: 05/27/1981
From: Coggin C, Coggins C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20004B957 (2)
Forwards Revised LER 80-045/01X-4
ML20004B950
Person / Time
Site: Hatch 
Issue date: 05/27/1981
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20004B950 (1)