Informs That Facility Design & Const Practices Meet Applicable Requirements of NUREG-0313,Revision 1 for Class 1,2 & 3 ASME Pressure Boundary Piping,Safe Ends & Fitting Matl
ML20004B046
Person / Time
Site: Clinton  
Issue date: 05/20/1981
From: Wuller G
ILLINOIS POWER CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0313, RTR-NUREG-313 U-0237, U-237, NUDOCS 8105270153
Download: ML20004B046 (1)


Text

.-

...A.

ILLINDIS POWER 00MPANY j,]y l gg (93_ggy_g 3 500 south 27TH STREET, DECATUR. tLLINOfS 62525 May 20, 1981 tr p

'V/

Mr. Darrell G. Eisenhut, Director i

'i Division of Licensing Office of Nuclear Reactor Regulation Ej_ L'g 2 G Kt _g3_

u.s. g y ma 7/

United __ State s, Nuclear 4egul-atvCommis s. ton e

Washington, D.

C.

20555 p

&_ /0

/

d'

Dear Mr. Eisenhut:

s/

,~

Clinton Power Station Units 1 & 2 Docket Nos. 50-461 and 50-462

Subject:

Implementation of NUREG-0313, Rev. 1,

" Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping (Generic Task A-42)"

(Generic Letter 81-03).

Reference:

D. G. Eisenhut's Letter of February 26, 1981, Same Subj ect.

The Clinton Power Station design and construction practices meet the applicable requirements of NUREG-0313, Rev. 1, for Class 1, 2, and 3 ASME pressure boundary piping, safe ends, and fitting material (including weld metal).

These requirements were antici-pated and extensive measures were taken to assure compliance with NUP.EG-0313.

If we can be of further assistance, please do not hesitate to contact us.

Sincerely, G. E. Uuller Supervisor-Licensing Nuclear Station Engineering CCH:ks cc:

C. I. Grimes, NRC Clinton Project Manager H. H. Livermore, NRC Resident Inspector 300/

.s l

/I 8105270153

.