ML20004B010

From kanterella
Jump to navigation Jump to search
Forwards Safeguards Contingency Plan.Affidavit for Withholding Encl.Plan Withheld (Ref 10CFR2.790)
ML20004B010
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/14/1981
From: Tauber H
DETROIT EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
EF2-52-829, NUDOCS 8105270104
Download: ML20004B010 (2)


Text

n e

[

\\

Harry Tauber g1 N Ceaucten WI

' M ~v~ n ? W m M; w

\\,% f G 2 h 1981 *

uc o m m u co 3 c...,gg,'lg="

f<,

May 14, 1981 EF2 - 52,829 Mr. Harold R.

Denton, Director United States Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C.

20555

Dear Mr. Denton:

Reference:

Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341

Subject:

Safeguards Contingency Plan 1

Enclosed herewith are six (6) copies of the " Safeguards Contingency Plan".

Detroit Edison is submitting this plan consistent with the requirements of 10CFR50.34(d) and 10CFR73 Appendix C.

In accordance with the Commission's Rules of Practice, specifically Section 2.790 of 10CFR Part 2 and Section 9.5 of 10CFR Part 9, The Detroit Edison Company hereby requests that the attached copies of the " Safeguards Contingency Plan" be treated as proprietary and withheld from public disclosure.

Sincerely,

[~MW rhv $

Enclosures cc:

D.

E. Howell L.

L. Kintner B.

Little O \\

W t

i N

319527e104

o O^

AFFIDAVIT IN SUPPORT OF APPLICATION TO WITHHOLD MATERIALS FROM PUBLIC DISCLOSURE i

WAYNE H. JENS, being duly sworn, says:

1.

I am Vice President - Nuclear Operations for The Detroit Edison Company.

My office is located at 2000 Second Avenue, Detroit, Michigan 48226.

I have the responsibility for the revies of the material contained in the " Safeguards Contingency Plan" for the Enrico Fermi 2 Atomic Power Plant, and I am authorized to apply for with-holding of this document from the public records; 2.

The " Safeguards Contingency Plan" consists of confidential commercial information relating to the safe operation and protection of the Fermi 2 Power Plant, and its contents have not been made available to the pubito fcr inspection; 3.

To the best of my knowledge and belief, the material contained within the " Safeguards Contingency Plan" is of a nature customarily exempted from public disclosure and is not available in public sources:

4.

The protection of the gener.sl public and of the Company from theft, sabotage or destruction of valuable Company property requires that the material contained within the " Safeguards Contingency Plan" be withheld from public disclosure.

Nd Wayne p'. Jens ( /

Vice PresidendJ Nuclear Operations The Detroit Edison Company Subocribed and sworn to before me this 14thday of May, 1981 i

<,G k' N.eC+ck.,. U l

(Name)

Notary Public, Wayne, County, Michigan, Acting in Oakland County.

My Commission e::pires: October 28, 1984 I

l

-_