Text
Commonwealth Elson one First Naboral Ptaza. Chicago. Ilknois Address Reply to: Post Office Box 767 Chicago, Illinois 60690 f$
h,P"Q'-l\\lf-/ t.h)\\
May 5, 1981 f
g w c a rgam I
i'. "'-
gy,,>-.....,
Mr. A.
Schwencer, Chief
~.
Licensing Branch 2 Division of Licensing U.S. Nuclear Regulatory Commission
^'
Washington, DC 20555
Subject:
LaSalle County Station Unit i Fuel Loading Schecule NRC Docket No. 50-373 Reference (1):
T. R. Tramm letter to H. L. Thompson dated January 9, 1981
Dear Mr. Schwencer:
The purpose of this submittal is to revise the information submittea in Reference (1) relative to the estimatto fuel loaa date for LaSalle County Unit 1.
Although ronstruction ano testing is proceeding quite well at this point, :he previously reportec fuel loac date of June 15, 1981 must be revised to September 15, 1981.
This change reflects somewhat greater than projected time necessary to complete the required analyses associated with the safety-relatea system supports as well as final fiela cesign installation and verification.
In the event we bei;me aware of any circumstances 4hich will significantly alter the revised date, we will inform jou.
Because of this schedule change, a request for extension of the l
LaSalle County Unit 1 Crostruction Permit and Special Nuclear i
Material License, both or which expire on June 30, 1981, will be submitted in May, 1981.
Very truly yours,
(. ? Q'.. i<
.9,-
L. O. DelGeorge Nuclear Licensing Mministrator cc:
NRC Resiaent Inspector - LSCS Bool 30458 g
810511 I'fg /