ML20003H942
| ML20003H942 | |
| Person / Time | |
|---|---|
| Site: | Columbia, Washington Public Power Supply System, Satsop |
| Issue date: | 05/06/1981 |
| From: | Bouchey G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Haass W Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20003H943 | List: |
| References | |
| QA-81-40, NUDOCS 8105080217 | |
| Download: ML20003H942 (1) | |
Text
SD-39"l
@P.O. BOX 96 Washington Public Power Supply System A JOINT OPERATING AGENCY 3000 GEO. WASHINGTON WAY AlCHLANO, WASHINGTON 99352 PHONE (509) 372 5000 May 6, 1981 QA-81-40 l
U.S. Nuclear Regulatory Comission Division of Engineering Washington, D.C.
20555 Attention:
Mr. W. P. Haass, Chief, Quality Assurance Branch
Subject:
OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION (WPPSS-QA-004)
Reference:
Letter, G. D. Bouchey to W. P. Haass, QA-81-23, dated February 27, 1981, same subject Gentlemen:
Enclosed for your review are three copies of Revision 5 to the Supply System Operational Quality Assurance Program Description (WPPSS-QA-004) as approved by Supply System management for implementation effective May 11, 1981.
The approved Revision 5 contains updated organizational information and supercedes, in its entirety, the Revision 4 (Draft 4) material provided to you with the reference. All changes in the text, relative to Revi-sion 4 (Draft 4) have been indicated by a vertical bar in the right hand margin.
Upon completion of your review and notifica+. ion of approval, we will sub-mit thirty-six copies for your use. Should you have any comments or ques-tions regardin this revision, please contact the Manager, Operational QA
& Services at 509) 372-6838.
l Very truly yours, G. D. Bou ey Director, Nuclear Safety
/kd 6001 s
Enclosures
///
/
8 " s08 4 q
_