ML20003H918

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Final Draft of Implementing Procedures for Emergency Plan
ML20003H918
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 03/19/1981
From: Reeves D
EDS NUCLEAR, INC.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20003H917 List:
References
0460-047-017, 460-47-17, NUDOCS 8105080175
Download: ML20003H918 (1)


Text

\

/ [ :e --

JG _ 3._L.

i edis() nuclear ED S Nsc; ear Inc.

350 Lennon Lane ,,

Walnut Creek, Cai.fomia 94598 (415) 943-4500

@0

- w i March 19, 1981

% t.

~

0460-047-017 /g tu '

Mr. Harold R. Denton, Director Office of Nuclear Reactor .%gulation U.S. Nuclear Regulatory Cormission Washington, DC 20555

SUBJECT:

Iowa Electric Light and Power Company DAEC Emergency Plan Implementing Procedures

REFERENCE:

Iowa Electric Light and Power Company Letter #LDR-81-79, dated March 2, 1981

Dear Mr. Denton:

Enclosed please find ten copies of each of the five subject procedures being forwarded to NRR as specified in the referenced letter. Titles of the procedures enclosed are identified in Attachment 1 to this letter.

While the referenced letter indicated that seven procedures would be transmitted by March 20, several of them were subsequently combined, reducing the total number to five. These procedures coupled with those transmitted on March 2 and March 13 constitute the total complement of procedures required to implement the DAEC Emergency Plan.

Ver truly yours, h

Donald L. Reeves,Jr./

-~ N. reasosiLtamnt'"7@$g pgg7Ep is AC00E0AIT3 "g,,

l Section Manager peg 0F 13FLi iAIlC','

Management Services Division DLR/cl 00 S cc: Mr. Larry D. Root y Assistant Vice President

{ Nuclear Generation l

Iowa Electric Light and Power [%

San Damsco New vorm. Anama. Pars M 8 8070/ 7 5 I_ -

_. . - . _ _ _ _ .