W APR 2 91$81 g,1 7,.g j'en yp
- Y,1 h* "'I'N FE!CRANDUM FOR: Samuel J. Chilk
'\\~
8/A -
Secretary of the Comission
%<s,%
FRCri:
William J. Dircks Executive Director for Operations
' cs ; Id SUBJ ECT:
C0ttilSSICN C0l'PENTS OH FULL-POWER CPERATIhG LICENSE FCR FARLEY UNIT 2 With respect to your March 13, 1981 meeorandum, the Director, Office of Nuclear Reactor Regulation, issued a full pcwer license (NPF-8) for Farley Unit 2 on 11 arch 31,1981 (copy enclosed). License condition 2.C.(18)(b) requires the submittal of a plan to bring safety-related electrical equipnent into ccepliance with PUREG-0588 within 90 days of the receipt of cur Safety Evaluation Report Supplecent No. 6, which was issued with the license.
License condition 2.E references all applicable requirerents in Section 2 of the license, thus correcting the error in the draft license sent to the Connission for consideration at its March 11,1981 :neeting.
t A status report on the review of plants according to the revised Standard Review Plan will be sent separately.
(Sign:D ?f2.1 J. Dir:ks William J. Dircks Executive Director for Operations
Attachment:
As stated i
l w~
um%sf
~
ne Ca u l1]s 4 4 SEE NEXT PAGE FOR DISTRIBUTION 4
"y I fD
$ q cdug d WJD h... h h.OL:L3=2.<intner:phbSchwencer CL:L342 CL:AD:L.
DL:0IR
=5
.OELO..........
E.M.
Tedesco NCEisenhut 5.4-J/.(y./81 4/ (Y./81 4/.I7
/81 J/ O f
/8I
- / ([ I 8I ID 1
-')
B i 0ii0 7 0 @ [o C
C "
- E 2 2 E 2 2 2 *
=
~
/
g l
5 a#
f r
>D'ORANDU!! FOR: Samuel J. Chilk Office of the Secretary FRCit:
William J. Dircks Executive Director for Operations
SUBJECT:
COMISSION CCIPEhTS ON FULL-PCWER PE TING LICENSE FOR FARLEY UhlT 2 With respect to your March 13, 1981 memoran m,
he Director, Office of Nuclear Reactor Regulation, issued a full owe license (hPF-8) for Farley Unit 2 on March 31,1981 (copy enclosed)
L ense condition 2.C.(18)(b) requires the suboittal of a plan to br g sf fety-related electrical equipment into compliance with NUREG-88 4riten 90 days of the receipt of leodnt
- o. 6, which was issued with the our Safety Evaluation Report Supp/
license.
License condition 2.E reference all applicable requirements in Section 2
^
of the license, thus correct 1 th error in the draft license Sent to the Cecnission for consideration at i s March 11, 1981 meeti ng.
A status report on the re iew plants according to the revised Standard Review Plan will be sen sepa ately.
William J. Dircks Executive Director for Operations Attachrent-As stated
{
~
\\
()
s SEENEXTPAGEFORh!STRIBUTION ti Qr;,,L'-
n
~
n b'
[L:DIR, 4f. [ 7l
") 0L:LB#2 jgl:.LB-
.. [DL:A
'NRR:DIR EDO 5 *""r > LKintne :ph ASchwen.cer..
. rte
.o.
dei's achut..
HDen. ton.
WJDi rcks..
05angu..
4/..If./814/1,/81 4/,jI /81 4/
/81 4/
/81 4/
/81 v/g,g
-..==.:.
c,=,= ; c.2. _,=, 5 c c.=.
- = ~i
.v.
m,
D Y
W y
W D
F DISTRIBUTION:
Docket File (50-364)
NRC PDR Local POR LB#2 File (2)
HDenton ECase PPAS SHanauer Dross TMurley BSnyder SVollmer HBerkow/WRussell DEisenhut RTedesco RPurple ASchwencer LKintner MService, W/ Copy of Incoming Attorney, OELD SCavanaugh (NRR 181-126)
EHughes W/ Copy of Incoming LB rry b
- ,, =>
a.3,.
- )
.: )
~ '
~-
,f H%q'o, d~
UNITED STATES
[hw 3')
NUCLEAR REGULATORY COMMISSION c.. ;
usmuotou. o. c. rosss k'.v f
o APR 2 91981 EMORANDUM FOR:
Samuel J. Chilk Secretary of the Comission FROM:
William J. Dircks Executive Director for Operations i
SUBJECT:
COMMISSION COMMENTS ON FULL-POWER OPERATING LICENSE FOR FARLEY UNIT 2 With respect to your March 13, 1981 memorandum, the Director, Office of Nuclear Reactor Regulation, issued a full power license (NPF-8) for Farley I
Unit 2 on March 31,1981 (copy enclosed).
License condition 2.C.(18)(b) requires the submittal of a plan to bring safety-related electrical equipment into compliance with NUREG-0588 within 90 days of the receipt of our Safety Evaluation Report Supplement No. 6, which was issued with the license.
l License condition 2.E references all applicable requirements in Secticn 2 l-of the license, thus correcting the error in the draft ifcense sent to the Comission for consideration at its March 11, 1981 meeting.
A status report on the review of plants according to the revised Standard l
Review Plan will be sent separately.
GW d..w. M.a William J. Dircks Executive Director for Operations l
Attachment:
As s*ated l
l l
l 1
l t
l
~.
.J=LL.
i UNITED STATES 4, (; [' '5 NUCLEAR REGULATORY COMMISSION WASHINGTO N. O. C. 20555
'n. ~.,,,. "
March 31, 1981 Docket No. 50-364 Mr. F. L Clayton, Jr.
Senior Vice President Alabama Pcwer Company Post Office Box 2641 Birmingham, Alabama 35291
Dear Mr. Clayton:
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 - ISSUANCE OF FACILITY CPERATING LICENSE The Nuclear Regulatory Comission has issued the enclosed Facility Operating License No. NPF-8-to the Alabama Power Company for the Joseph M. Farley Nuclear Plant, Unit 2, located in Houston County, Alabama.
Facility Operating License NPF-8 authorizes operation of the Joseph M. Farley Nuclear Plant, Unit 2, at 100 percent power (2652 megawatts thernal) upon completion of certain related construction items.
Your attention is specifically directed to the 90-day requirement of license condition 2.C.(18)(b) to either (1) complete the documentation on environmental qualification for Class IE equipment, or (2) comit to alternat.tve actions which will result in full compliance with NUREG-0588 no later than June 30, 1982.
Also enclosed is a copy of the Safety Evaluation Report Supplement No. 6 supporting this action (NUREG-0117), tnd a copy of the notice which has been forwarded to the Office of the Federal Register for publication.
- incerely, m.a. 0 u
u sep tit, v.
l u
Division oN Licensing l
l Office of Nuclear Reactor Regulation
Enclosures:
1.
Facility Operating License 2.
Supplement No. 6 3.
Federal Register notice cc w/ enclosures:
See next page d
hf ff p q# $c
ccs,w/ enclosures:
Mr. Alan R.
Barton Defense Mapping Agency Executive Vice President Aerospace Center Alabama Power Company f,.
Louis Air Force Station P. O. Box 2641 Missouri 63118 Birmingham, Alabama 35291 Federal Energy Regulatory Commission Mr. Ruble A. Thomas 825 North Capital Street, N.E.
Vice President Washington, D. C. 20426 Southern Company Services, Inc.
P.O. Box 2625 Mr. W.
Bradford Sirmingham, Alabama 35202 NRC Residen Inspector /Farley O. Box 1814 Mr. George F. Trowbridge Dothan, Alabama 36302 Shaw, Pittman, Potts and Trowbridge 1800 M Street, N. W.
Washington, D. C. 20036 Ira L. Myers, M.D.
State Health Officer State Dept of Public Health State Office Building Montgomery, Alabama 36104 Honorable A. A. Middleton Chairman Houston County Commission Dothan, Alabama 36301 U.S. Environmental Protection Agency Attn:
EIS Coordinator Region IV Office 345 Courtland Street, N.E.
Atlanta, Georgia 30308 U.S. Environmental Protection Agency Attn:
Ms. F. Munter Office of Federal Activities Room W-535, Warerside Mall 401 M Street, S. W.
Washington, D. C. 20460 l
l Attorney ceneral State' Capitol Montgomery, Alabama 36104 i
e r
n.
---r
~n, n
e e-,--
-eww-----,mm e
w
- D*Cs c,
UNITED STATES
! ~*
NUCLEAR REGULATORY COMMISSION 3 @, h d * %
i WA5m NGTON. D. C. 20555
/)
.....[
ALABAMA POWER COMPANY DOCKET NO. 50-364 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 FACILITY OPERATING LICENSE License No. NPF-8 1.
The Nuclear Regulatory Commission (the Comission or the NRC) having found that:
A.
The application for licenses filed by the Alabama Power Company complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies hase been duly made; B.
Construction of the Joseph M. Farley Nuclear Plant, Unit 2 (the facility), has bean substantially completed in conformity with Construction Permit No. CPPR.86 and the application, as amended, the provisicas of the Act and the regulations of the Comission; C.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Comission; D.
There is reasonable assurance: (i) that the activities authorized b'y this license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; E.
The Alabama Power Company is technically and financially qualified to engage in the activities authorized by this license in accordance with the Comission's regulations set forth in 10 CFR Chapter I; F.
The Alabama Power Company has satisified the applicable provisions of 10 CFR Part 140, " Financial Protection Requirements and Indemnity Agreements", of the Comission's regulations; G.
The issuance of tnis license will not be inimical to the comon defense and security or to the health nd safety of the public;
- pk'l F
()
3 A $
F
~
se
~
-ne
UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-364 ALABAMA POWER COMPANY NOTICE OF ISSUANCE OF FACILITY OPERATING LICENSE Notice is hereby given that the U.S. Nuclear Regulatory Comission (the Codssion) has issued Facility Operating License No. NPF-8 to Alabama Power Company which authorizes operation of the Joseph M. Farley Nuclear Plant, Unit 2, (Farley Unit 2), ac reactor core power levels not in excess of 2652 megawatts thermal (100 percent power) in accordance with the provisions and conditions of the license, the appended Technical Specifications and the Environmental Protection Plan. Prior to operation at power levels exceeding 5 percent, certain license conditions must be met. This license supersedes the Fuel Leding and Low Power Testing License issued October 23, 1980.
Farley Unit 2, is a pressurizec water reactor located in Houston County, Alabama. Prior public notice of the overall action involving the proposed issuance of facility operating license was issued in the Federal Register on November 29,1973 (38 FR 29907).
The application complies with the standards and requirements of the Act and the Comission's rules and regulations. The Comission has made appropriate findings as required by the Atomic Energy Act of 1954, as amended (the Act),
and the Comission's rules and regulations in 10 CFR Chapter I, which are set ferth in the facility operating license.
The Comission has detemined that the issuance of this facility full power operating license will not result in any environmental impacts other than those evaluated in the Final Environmental Statement since the activity authorized by the license is encompassed by the overall action evaluated in l
the Final Environmental Statement.
U K Ckr GCud?pgg
. A, copy of (1) Facility Operating License NPF-8, complete with Technical Scecifications (NUREG-0697 as revised) and Environmental Protection Plan; (2) the report of the Advisory Committee on Reactor Safeguards dated June 12, 1975; (3) the Office of Nuclear Reactor Regulation's Safety Evaluation Report (NUREG-75/034) dated May 1975, Supplement 1 dated October 1975, Supplement 2 dated October 1976, Supplement 3 dated June 1978, Supplement a dated September 1980, and Supplements and 6 dated March 1981 (supplements are NUREG-Oll7); (4) the Final Safety Analysis Report and sr.endments thereto; (5) the licensee's Environmental Report and supplements thereto; (6) the NRC Draft Environmental Statement dated July 1974; (7) the NRC Final Environmental Statement (FES) dated December 1974, the NRC Environmental Assessment dated April 1977, and the FES Addendum dated September 1980 (NUREG-0727); and (8) the NRC Flcod Plain Review of the Joseph M. Farley Nuclear Plant site dated September 17, 1980, are available for public inspection at the Commission's Public Document Room,1717 H Street, P.W., Washington, D. C.,
and the G. S. Houston Memorial Library, 212 W. Burdeshaw Street, Dothan, Alabama 36303.
A copy of the facility operating license may be obtained upon request addressed l
to the U.S. Nuclear Regulatory Commission, Washington, D. C. 20555, Attention:
Director, Division of Licensing.
Cepfes of the Safety Evaluation Report and Supplements, and the Final Environmental Statement and Addendum mcy be purchased at current rates from the National Technical Information Service, 5235 Port Royal Road, Springfield, Virginia 22161, and through the NRC GPO sales program by writing to the U.S. Nuclear 1
v
C).
Regula' tory Commission, Attention: Sales Manager, Washington, D. C. 20555. GPO deposit holders can call 301-492-9530.
Dated at Bethesda, Maryland, this 31st day of March 1981.
FOR THE NUCLEAR REGULATORY CCP9tISSION
/ i i j
. _f - -
- u.., a,,/
,i...
'~A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing i
l e
---er r
,,,,,,..r.-
r.
m,-
--w,-.e c
,.,.,-,-,,,7--,.,y-----,-r--
y y
v-e