ML20003H756
| ML20003H756 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 04/06/1981 |
| From: | Wuller G ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| IEB-80-21, U-0224, U-224, NUDOCS 8105070402 | |
| Download: ML20003H756 (1) | |
Text
,.
l U-0224
'/LL/NOIS POWER 00MPANY
,9 LO8-81(04-06)-6 500 SOUTH 27TH STREET, DECATUR,ILUNOIS 62525 April 6, 1981
=
Mr. James G. Keppler
<['
Director, Region III
~p
\\
Office of Inspection & Enforcement J
U. S. Nuclear Regulatory Commission 2
Q g
799 Roosevelt Road
,3)7 pG Glen Ellyn, Illinois 60137 i
i y
J
-).
E
Dear Mr. Keppler:
/
ou ' u \\ ' ?
t Clinton Power Station Units 1 & 2 Docket Nos. 50-461 and 50-462 Construction Permits No. CPPR-137 & CPPR-138 This is in reply to your letter of November 6, 1980, whereby you forwarded IE Bulletin No. 80-21 which reported on the failures of some valve yokes supplied by Malcolm Foundry Co., Inc.
Please be advised that Clinton Unit I has no active safety related valves with parts cast by Malcolm Foundry Co.,
Inc.
Sincerely, f
G. E. Wuller Supervisor - Licensing Nuclear Station Engineering GEW/en cc:
H. H. Livermore, NRC Resident Inspector Director, Office of I & E, Div. of Reactor Operations Inspection NRC, Washington, D. C.
I 6
APR 10' om 810 507040R