ML20003H551

From kanterella
Jump to navigation Jump to search
Deficiency Rept Re Containment Liner Penetrations Initially Reported 810326.Util Has Conducted Weld Insp of Penetrations Questioned.Engineering Evaluation to Determine Impact Initiated.Final Rept to Be Submitted by 810717
ML20003H551
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/29/1981
From: Ehrensperger W
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
GN-129, NUDOCS 8105060313
Download: ML20003H551 (2)


Text

/'1 Georg'a Pcue' Company

  • d f(A A#
  • 313 P'edmont Avenue
  • /@

At.anta Gecria 30308 Te'epnone 404 526 6526 Ma.hng Actess M

Post Of'.ce Don 4545 Atlanta, Georg.a 30302

/sf4f W. E. Ehrensperger or V ce Pres,aent S Group Enecutme-e.

, the southern e+ctr c system h~

/

g,t a

April 29, 1981 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 3100 101 Marietta Street File: X78G03-M18 Atlanta, Georgia 30303 Log:

GN-129 Attention: Mr. James P. O'Rielly

Reference:

Vogtle Electric Generating Plant-Units 1 and 2 50-424 and 50-425; Containment Liner Penetrations Gentlemen:

Georgia Power Company verbally notified Mr. Paul Kellogg of the Nuclear Regulatory Commission on March 26, 1981, of a potentially signi-ficant deficiency concerning welds on containment liner penetrations.

Georgia Power Company has conducted weld inspections of the penetrations in question and has begun an engineering evaluation to deter-mine the significance of this problem. Additionally, Georgia Power Company is reviewing the need to conduct a quality assurance audit at the vendor manufacturing facility.

It is expected these evaluations will be concluded in June, 1051.

Georgia Power Company expects to submit a final report to the Commit,sion concerning the reportability of this potential deficiency en or before July 17, 1981.

This response contains no proprietary infomation and may be placed in the NRC Public Document Room upon receipt.

Yours truly, ld]([4 Wy W. E. Ehrenspery r

(/

Senior Vice President & Group Executive-Power Supply CWH:skf xc: See Page 2

("el4 n

/

8105060 %

5

0..

Mr. James P. O'Rielly 50-424; 50-425; Containment Liner Penetrations April 2,1981 4

Page 2 xc-

. S. Nuclear Regulatory Commission Attn: Victor J. Stello, Jr., Director Office of Inspection and Enforcement Washington, DC 20555 J. H. Miller, Jr.

F. G. Mitchell, Jr.

R. J. Kelly C. F. Whitmer R. E. Conway D. E. Dutton R. W. Staffa H. C. Nix i

K. M. Gillespie L. T. Gucwa C. R. Miles, Jr.:

E. D. Groover 4

D. L. McCrary R. A. Thomas

0. Batum J. A. Bailey M. Z. Jeric B. L. Lex i

2