Text
]&
+nsiva g
UNITED STATES NUCLEAR REGULATORY COMMISSION
~
o r.
- l WASHINGTON, D. C. 20666
\\,***I /
'APR 18 1889 Docket Nos. :
50-329/330 OM, OL HEMORANDUM FOR:
F. J. Miraglia, Acting Chief, Licensing Branch No. 3, DL FROM:
D. S. Hood, Project Manager, Licensing Branch No. 3, DL
SUBJECT:
NOTICE OF MEETING - MIDLAND FLANT, UNITS 1 AND 2 DATE & TIME:
May 5-7, 1981 8:30 a.m.
LOCATION:
Rm. P-ll4 (5th), Rm. P-ll4 (6th), Rm. P-422 (7th)
Phillips Building Bethesda, Maryland PURPOSE:
TO DISCUSS (1) REMEDIAL ACTIONS AND UPDATE OF S0ILS DEFICIENCIES, AND (2) REVIEW STATUS OF AMENDMENT 85 0F APPLICATION E
NRC NRC Consultants PARTICIPANTS G. Lear F. Schauer U. S. Army Corps of Engineers R. Bosnak, et.al.
Naval Surface Weapons Center Energy Technology Engineering Center Consumers Power Company G. Keeley, et.al.
Bechtel L. Curtis, et.al.
x H-D Darl S. Hood, Project Manager Licensing Branch No. 3 Division of Licensing
Enclosures:
1.
Backgraund and Agenda 2.
3/23/81 Letter cc:
See next page.
E eetings between NRC technical staff and applicants for licenses are open M
j for interested members of the public, petitioners, intervenors, or other i rL parties to attend as observers pursuant to "Open Meeting and Statement of 9*
8185060085
Mr. J. W. Cook Vice President Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201 I
cc: Michael I. Miller, Esq.
Mr. Don van Farowe, Chief Ronald G. Zamarin, Esq.
Division of Radiological Health Alan S. Farnell, Esq.
Department of Public Health are Isham, Lincoln & Beale P.O. Box 33035 Suite 4200 Lansing, Michigan 48909 1 First National Plaza Chicago, Illinois 60603 James E. Brunner, Esq.
William J. Scanlon, Esq.
Consumers Power Company 2034 Pauline Boulevard 212 West Michigan Avenue Ann Arbor, Michigan 48103 Jackson, Michigan 49201 U. S. Nuclear Regulatory Commission Myron M. Cherry, Esq.
Resident Inspectors Office i
1 IBM Plaza Route 7 Chicago, Illinois 60611 Midland, Michigan 48640 3
Ms. Mary Sinclair Ms. Barbara Stamiric 5711 Summerset Drive 5795 N. River Midland, Michigan 48640 Freeland, Michigan' 48623 Frank J. Kelley, Esq.
Attorney General State of Michigan Environmental Protection Division 720 Law Building Lansing, Michigan 48913 Mr. Wendell Marshall Route 10 Midland, Michigan 48640 Mr. Steve Gadler 2120 Carter Avenue St. Paul, Minnesota 55108
(..
l l
M Y' i
cc: Commander, Naval Surface Weapons Center ATTN:
P. C. Huang White Oak Silver Spring, Maryland 20910 Mr. L. J. Auge, Manager Facility Design Engineering Energy Technology Engineering Center P. O. Box 1449 Canoga Park, California 91304 Mr. William Lawhead U. S. Corps of Engineers NCEED - T 7th Floor 477 Michigan Avenue Detroit, Michigan 48226 Charles Bechhoefer, Esq.
Atomic Safety & Licensing Board U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Mr. Ralph S. Decker Atomic Safety & Licensing Board U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Dr. Frederick P. Cowan Apt. B-125 6125 N. Verde Trail Boca Raton, Florida 33433 i
Ef<l"'
BACKGROUND The meeting is in response to the applicant's letter of March 23, 1981 (attached) to further discuss the matters therein.
However, the matter of seismic design criteria is the subject of separate meetings 1/.
Amendment 85 of the Midland application, which responds to several requests for additional information (Questions 39 through 53) regarding soils deficiencies, will also be discussed, with particular emphasis upon the identification and resolution of open items 2/ from the review of that amendment by the NRR staff and its consultants.
I AGENDA 1.
Dewatering - Installation of intercepter back-up wells and permanent dewatering system design.
2.
Underground Piping - Planned activities and results of investigation to date.
3.
Additional Soil Borings - Update on borings.
4.
BWST - Causes of ring beam foundation cracks and remedial activities.
5.
Review of Amendment 85 (Soils, Structural) 6.
Remedial Activities (a) Service Water Building (b) Auxiliary Bldg. Electrical Penetration area and FW Valve Pit.
3/ previous Notice of Meeting has scheduled April 16, 1981 fo.- discussion Aof the first two of three reports on Midland seismic criteria; scheduling of a subsequent meeting for the third report is pending receipt of that report by NRC.
2/ ee Transcript for Oral Deposition of Joseph Kane, NRC, on 3/26,27/81.
i S
I
g#
~
]
James W Cook
- 14..,,,..
.% s.. s >.
Vice bessdent - hopes In,s.wennt I
Kg_
and Consrussion
.s.-
oeneral offkes; 1946 West Parnell Road, Jackson. MI 49201. (5171 788 0453 March 23, 1981 4%
/ g
- D< (b :
e, s
O q,n" 25 g074, C f
M 2'
g%
Harold R Denton,' Director Office of Nuclear Reactor Regulation Nde,, ae,r US Nuclear Regulatory Commission
,6 y
Washington, DC 20555 "J
L MIDLAND PROJECT b
I ACTIVITIES FOR THE RESOLUTION OF OUTSTANDING ISSUES REGARDING THE MIDLAND S0ILS HEARINGS FILE:
0485.16, B2.5.2 UFI:
42*05*22*01, 00234S, 71*01 SERIAL:
11625 This letter is submitted to document the telephone conversation of February 27, 1981 between myself, R H Vollmer, and members of both our staffs. The call addressed several matters relating to the Midland soils hearings.
In order to put the items discussed in context, a brief background summary is presented below.
On August 22, 1978 Consumers Power Company verbally notified the Region III Resident Inspector that the partially completed diesel gen'erator building was experiencing more settlement than had been postulated. This was later determined to be due to inadequate compaction of backfill. A 50.55(e) report was initially issued on September 29,.1978 and further interim 50.55(e) reports were issued until the last report of February 7,1980, af ter which subsequent information was supplied by 50.54(f) responses.
I On March 21, 1979 the NRC issued the initial 50.54(f) request regarding plant fill and subsequent requests were issued. Answers to most of these 50.54(f) questions have been forwarded with the latest being Araendment 88 (Rev 11 to the 50.54(f) responses) dated March 16, 1981. On December 6, 1979 an Order Modifying Construction Permits No CPPR-81 and CPPR-82 was issued by the NRC.
I A princi' pal reason this order was issued was due to the Staff's erroneous assumption that remedial actions, other than the surcharging of the diesel l
generator building, were proceeding. On December 26, 1979 Consumers Power Company requested a hea: m in accordance with Part V of the Order.
On October 14, 1980 a letter from R L Tedesco to us indicated that one of the open items associated with the review of our operating licenses for Midland Units 1 and 2 was the establishment of additional seismological input parameters against which to review the plant structures and equipment.
The letter stated that con.,ideration of this open item would also be introduced into the review of the remedial actions associated with the soils settlement matter which was the subject of the December 6,1979 Order Modifying Construction Permits.
{
ec0381-0258a100 wp 4 Bl@2G47C# MPk 5N
2 Since our initial notification to the NRC about the soils problem, ther
.sve been many meetings and telephone conversations to discuss the proposed remedial actions and the responses to questions by the NRC and their consultants. -In addition, depositions have been taken by Consumers and the
.NRC.
During all the above activities it has become apparent that there are some areas of disagreement between the Staff and its consultants and Consumers and its consultants.
In addition, the October 14, 1980 letter from R L Tedesco on a seismic response spectra has placed us in the position of having to evaluate our remedial fixes against an unknown, but possibly higher margin, since the site specific response spectra issue could-result in structural loads larger than those resulting from an SSE zero period acceleration of 0.12g and modified Housner spectra which are the PSAR and FSAR design basis.
1 On February 27, 1981 I initiated the referenced call to R II Vollmer and ot her Staff personnel to inform the Sgaff of new developments. We hope these 1
actions will help resolve certain issues that to date have been in contention i
with the Staff. We also hope that the Staff will look favorably on our I
requests to pursue with your concurrence certain activities which if not undertaken shortly will have a significant adverse schedule impact.
1.
BORINGS While we still disagree with the need to take additional borings and run tests, we will take borings as specified in the January 8, 1981 letter to us from R L Tedesco. Consolidation tests by an independent ' aboratory will be run on soils samples taken near the diesel generator rea to obtain pre-consolidation pressures, and comparisons will be made to the calculated stresses to which the soils in the areas of the samples were subjected during the surcharge program. An evaluation of these tests and l
results will be undertaken to assess the level of uncertainty inherent in l
these data. Shear strength tests will be run on soils samples taken in j
l the power block area to determine factors of safety for bearing capacity.
Shear strength tests will also be run on soils samples taken frem dike t
borings to substantiate slope stability. We will keep the Staff informed of all the above activities so that they can witness the activities, if desired. The results of the test program will be submitted and reviewed with the Staff, 2.
SERVICE WATER BUILDING AND ELECTRICAL PENETRATION AREAS The October 14, 1980 R L Tedesco letter on seismic, accelerated the completion of a margin analysis of the underpinning systems proposed an remedial actions. While all structural analyses ' nave shown the t'ixes to be adequate for the plant seismic design basis of.12g, there was concern l
that a seismic margin analysis based on the currently undefined site l
specific response spectra would introduce new potential areas of i
contention with the Staff. As a result we have decided to change from a pile suppo'rt design for the overhang portion of the service water building to an underpinning concept. involving a full length wall under the overhang portion with the wall extending into the till. We are confident t h.i t this will provide sufficient margin for any reasonable resolution of the <ise l
oc0381-0258a100 l
I
l
~
3 l
i 4
specific response spectra issue. The conceptual design for this appr. ach I
will be available to allow discussions with the Staff in April 1981.
The remedial action under the electrical penetration area will remain essentially the same as has been described both in discussions and in answers to Staff q'uestions, except that more caissons and some enlargement of the_ base of the pier under the valve pit will be utilized in order to obtain additional margin.
3.
PERMANENT PLANT DEWATERING Although it is our legal opinion that we can implement remedial actions at our own risk without Staff concurrence, we have chosen not to proceed without their knowledge and concurrence. The single pacing activity for the entire sequence of installing the remedial underpinnings is the completion of the permanent plant dewatering system.
The first phase of thisactivtyistheinstallggionofafewback-upwellscommencinginMay of 1981.
A large amount of snformation on the permanent plant dewatering system has been -provided to the Staf f.
Installation of back-up wells along the service water a'ad circulating water buildings will facilitate draw down and recharge rate tests, verify the design of the remainder of the permanent plant dewatering system, provide dewatering settlement data, and facilitate preparation for installation of the wall under the overhang portion of the service water structure.
Since the wells can be abandoned and grouted, we do not believe it is necessary to consider the installation of wells as an irrevocable 3
committment.
We request that the Staff concur with our position and that we so notify the Soils Licensing Board.
i 4.
SITE SPECIFIC SEISMIC CRITERIA We have had several discussions with the Staff on this subject, and as previously requested by them we supplied them with the Final Report Pa rt I
" Response Spectra - Original Ground Surface" and Part III " Seismic Hazard l
Analysis". Part II entitled " Response Spectra For Top of Fill and Theoretical studies on possible Ground Motion Amplification Through Fill under the Diesel Generator Building" will be furnished by April 1981.
As already scheduled, we will be meeting with the Staff on these issues on April 16, 1981.
I cur objective is not only to resolve the site specific response spectra with the Staff but also to recognize and schedule with the Staff l
management the total sequence of seismic margin analysis activities that are currently required in the operating. licensing process.
We are also petitioning the soils heariag Licensing Board to remove the seismic issue from that hearing and urge the Staff to consider our motion and join with us if possible.
l ac0381-0258a100
4
)
i l
+
f
\\
In prior conversations with Mr Vollmer on the general topic of resolution of issues, it was anticipated that the Staff could support an expedite 1 review of the underpiccing designs.
Bas ~ed on the scheduled subettt.ila of
., we are hopeful that as much staff review of these matertals as possible can be accomplished prior to the hearing while still reflecting the limitation of Staff resources. We will be in contact with the NRC's Midland project manager to pursue in detail the additional submittals and meetings referenced in this letter.
JWC/GSK/cr i
i r
CC:
RJCook, Midland Resident Inspecto l
Atomic Safety & Licensing Appeal Board j
Atomic Safety,& Licensing Board Panel
[
Charles Bechhoefer, Esq James E Brunner, Esq Myron M Cherry, Esq Dr Frederick P Cowan Mr Steve Gadler D F Judd, Sr Project Manager Frank J Kelley, Esq Ralph S Decker Mr Wendell H Marshall I
l Michael Miller, Esq I
William D Paton, Esq l
f Ms Mary Sinclair Barbara Stamiris Mr C R Stephens Chief, Docketing & Service Section i
k i
I L
v L
t l
r l
ocC181-0258a100 4
4
ATTACHMENT 1 NEAR TERM SCHEDULE MILESTONES FOR ACTIVITIES RELATED TO SOILS KEARINGS A.
SEISMIC DESIGN CRITERIA 1.
Submit Weston Report Part I and III to NRC. Completed and provided to NRC on 3/3/81.
2.
Submit Part II in April 1981.
3.
Meet with NRC Staff in April to discuss resolution of issues. Also discuss schedule for resolution of these issues with respect to Operating License.
B.
PERMANENT PLANT DEWATERING 1.
Drillanddevelopbac'h'-upwellsalongservicewaterandcirculating water pump house 5/1/81 statt.
2.
Drill and development remainder _ of permanent plant dewatering wells.
11/1/81 start.
C.
AUXILIARY BUILDING 1.
Meet with NRC on conceptual design April 1981.
2.
Complete conceptual design 6/1/81.
3.
Complete final design 8/1/81.
NOTE: Construction activities are scheduled to the following milestones:
Award cubcontract 1/1/82; Mobilize 4/1/82; Start Excavation and installation 6/1/82; Complete Ap:i1 1983.
D.
SERVICE WATER PUMP STRUCTURE 1.
Meet with NRC on conceptual design April 1981.
2.
Complete conceptual design April 1981.
3.
Complete design 6/15/81.
[
NOTE: Construction activities are scheduled to the following milestones:
i Award subcontract 1/1/82; Mobilize 9/1/82; Start Excavation and I
installation 11/1/82; Complete May 1983.
E.
UNDERGROUND UTILITIES h
Meet with NRC in April 1981 on results of discussions with Consultants i
and discuss schedule for completion of investigation.
l
-c0181-0258b100 l
2 F.
B0 RINGS 1.
Issue specification and retain subcontractor 3/23/81.
2.
Commence Borings week of 3/23/81.
3.
Commence Lab Testing week of 3/30/81.
4.
Complete Borings 5/1/81.
5.
Complete Lab Testing 6/8/81.
I 6.
Periodically review results of detailed program 3/23/81 to 6/8/31, with NRC.
G.
BORATED WATER STORAGE TANKS 1.
Meet with NRC on reme' dial actions April 1981.
l k
i J
l i
oc0381-0258b100 t
i
MEETli;G t10IlCE l'1511:1110T10" g g g4 Docket File IIRC POR J. Stol/.
Local PDR S. llanauer P. Collins TERA D. Vassallo ilSIC o
<d D. Ziemann Branch File E. Hughes
,9
//
/
(9 E. Case F. Schroeder
/ f[ '.:2
//p D. Eisenhut K. Kniel
.. o,4 8
(
T R. Purple D. Skovholt 71-p0
/g /
T. flovak G. Knighton M
g 4C
. S. Varga M. Erns t h.(
..%, 'I J
T. Ippi.lito R. Baer lh R. A. Clark E. Adensam GUQ/TtA '
W R. Reid A. Thadani e'
R. Tedesco ACRS (16)
B. Youngblood Attorney, OELD A. Schwencer 01E (3)
F. Mi aglia 0S0 (7)
J. R. Miller Project flanager D. Hood G. Lainas Licensing Assistant Ales D. Crutchfield Receptionist W. Russell J. Olshinki J. LeDoux, ISE R. Vollmer V. Moore i
R. Ilosnak 1&E lleadquarters F. Schauer I&E Region I R. E. Jackson 1&E Region 11 G. Lear 1&E Region Ill J. Knight 1&E Region IV S. Pawlicki I&E Region V V. Benaraya T. Murley Z. Rosztoczy NRC
Participants:
G. Lear W. llaass F. Schauer D. Muller R. Bosnak, et.al.
R. Ballard W. Regan -
R. Mattson P. Check O. Parr F. Rosa bcc: Applicant & Service List W. Butler W. Kreger R. W. Houston T. ilurphy W. Gannill L. Rubenstein T. Speis W. Johnston B. Grimes
- 11. Collins F. Pagano S. Ra;r:os J.
Kramer
.