ML20003H475
| ML20003H475 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 04/24/1981 |
| From: | Earnestine Clay NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20003H473 | List: |
| References | |
| 70-1113-81-03, 70-1113-81-3, NUDOCS 8105060082 | |
| Download: ML20003H475 (1) | |
Text
po rtr CQMAIKS 2.790!?tfORMAIWR
,j oy%
UNITED STATES e
8
- t NUCLEAR REGULATORY COMMISSION Ef REGION ll e
101 MARIETTA ST N.W SUITE 3100 k
p ATLANTA, GEORGIA 303o3 n
Report No. 70-1113/81-03 Docket No. 70-1113 License No. SNM-1097 Safeguards Group III Licensee: General Electric Company P.O. Box 780 Wilmington, NC 28401 Facility Name:
Wilmington Manufacturing Department Inspection at Wilmington, NC Inspection Conducted: March 31,1981 - April 3,1981 Date of Last Material Control and Accounting Inspection Visit:
February 23-27, 1981 Type of Inspection: Announced Material Control and Accounting Inspector:
bWN4b J.,
4[lY b l E. L. Clay h
5 Date Signed Approved by:
YbT Nt mx._
4 /24 /7I E. J. McAlpine, Chibf, MC&A Section Date Signed Technical Inspection Branch Engineering and Technical Inspection Division Inspection Summary Areas Inspected: NDA Measurement Controls (MAPS) and Physical Inventory Verifi-cation (MAPS).
The inspection involved 25 inspector-hours on site by one NRC inspector and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in all areas examined during this inspection.
~
WI 56 5-72 Copies CopVE is not to be Thi; UU"'
reprcduced ' Tith 3... apccifio approval of IE:11 MATERIALTRANSMITTED HEREWITH 8105060082 C0llTAlHS 2.7% INFORMAT10N 1
_ _ _