ML20003H458

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 5 to License DPR-77
ML20003H458
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 04/15/1981
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20003H456 List:
References
NUDOCS 8105060023
Download: ML20003H458 (3)


Text

O UNITED STATES NUCLEAR REGULATORY COM!ilSSION DOCKET NO. 50-327 TENNESSEE VALLEY AUTHORITY NOTICE OF ISSUANCE OF AMENDMENT FACILITY OPERATING LICENSE NO. Dr

'7 The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 5 to Facility Operating License No. DPR-77, issued to Tennessee Valley Authority (licensee) for the Sequoyah Nuclear Plant, Unit i !the facility) located in Hamilton County, Tennessee. This amendment enanges the time limit on the operation of the containment purge and vent systems from 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> per 365 days to less than or equal to 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> per 355 days.

The application for the amendment complies with the standard and require-i ments of the Atomic Energy Act of 1954, as amended (the Act), and the Commis-I sion's regulations. The Commission has made appropriate findings as required by the Act and the Commission's regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consider-ati on.

)

l l

The Commission has detennined that the issuance of this amendment will not 1

result in any significant environmental impact and that pursuant to 10 CFR 551.5 l

(d)(4) an environmental impact statement, or negative declaration and environ-

{

mental impact appraisal need not be prepared in connection with issuance of this l

amendment.

l l

l 8185060023

e.

For further details with respect to this action, see (1) Ten,essee Valley Authority letters dated January 8,1981, February 10,1981, March 3,1981, and and April 2, 1981 (2) Amendment No. 5 to Facility Operating License No. DPR-77 with Appendix A Technical Specification page changes, and (3) the Commission's related Safety. Evaluation.

All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, N. W., Washington, D. C., and the Chattanooga Hamilton County Bicentennial Library,1001 Broad Street, Chattanooga, Tennessee 37402. A copy of Amendment No. 5 may be obtained upon request addressed to the U'. S. Nt. clear Regulatory Commission, Washington, D. C.

20555, Attention: Director, Division of Licensing.

t i

Dated at Bethesda, Maryland this 15th day of April,1981.

FOR THE NUCLEAR REGULATORY COMMISSION J CDUIAV A. Schwencer, Chief Licensing Branch No. 2 i

Division of Licensing I

.l

DISTRIBUTION:

Docket Files 50-327/328 NRC PDR Local PDR LB#2 File H. Denton/ E. Case Attorney, OELD D. Eisenhut R. Purple R. Tedesco A. Schwencer T. Kenyon C. Stahle M. Service H. Berkow L. Cobb I&E (5)

D. Biddle, MPA B. Jones,(4)

R. Diggs, ADM T. Murley S. Hanauer e

f B. Scharf, ADM (10)

/Ah R. Vollmer 6

B\\

D. Ross v

B. Grimes r9 W. Pasciak o 't.

g

  • s.d',"#'j T

a C. Miles, PA t

sT s.f.

i U

BCC: ACRS (16)

.y

'+c-(\\,

NSIC LTERA TIC ASLBP ASLAP l

r+-