ML20003H406
| ML20003H406 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/24/1981 |
| From: | Creed J, Finley A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML20003H403 | List: |
| References | |
| 50-313-81-12, NUDOCS 8105050803 | |
| Download: ML20003H406 (1) | |
See also: IR 05000313/1981012
Text
-
-
OQ
U.S. NUCLEAR REGULATORY COMMISSION
OFFICE OF INSPECTION AND ENFORCEEhT
REGION III
Report No. 50-313/81-12
Docket No. 50-313
License No. DPR-51
Safeguards Group IV
~ Licensee: Arkansas Power and Light Company
Sixth and Pine Streets
Pine Bluff, AZ 71601
Facility Name: Arkansas Nuclear On?, Unit 1
.
Inspection At: Russellville, Arkansas
Inspection Conducted: April 7-10, 1981
Date of Last Material Control and Accounting Inspection: October 3-6, 1978
Type of Inspection: Unannounced, Material Control and Accountability
Inspector:
+<.224/
hd #+'/fP/
A. G. Finley
J7
/
Dat(
RIII Auditor
.[f /97/
Approved By:
.
'
h. Creed, Acting Chief
f
Date/
afeguards Section
Inspection Summarv:
Inspection on April 7-10, 1981 (Report No. 50-313/81-12)
Areas Inspected: Nuclear material control and accounting includi7g facility
organization and operations, measurement and controls, shipping ati receiving,
storage and internal control, inventory and inventory verification, and
records and reports. The inspection involved 28 inspector-hours onsite by
one NRC inspector and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements
in the six areas examined during the inspections except for the following
one item (Severity Level VI): Failure to date receiver's signature and
failure to submit Forms VRC-741 within the required ten day interval when
shipper's values were accepted (Paragraph 6).
(Contains 2.790 information)
i
l
l
I
8105050%O3
l
..
--
.
._