ML20003H341
| ML20003H341 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 04/29/1981 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20003H342 | List: |
| References | |
| NUDOCS 8105050615 | |
| Download: ML20003H341 (1) | |
Text
,
TENNESSEE VALLEY AUTHORITY N
$ pr[
/q%-}
400 Chestnut Street Tower II N
April 29,1981 b
Y L.
i' l' AT 0 4193% 9 6
i "IclMg*proar h
\\0f)/>.
' 0 '/
-(
Mr. J. P. O'Reilly, Director-Office of Inspection and Enfo rcement
' IJ Tft U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW., Sui' e 31c0 Atlanta, Georgia 30303
Dear "r. O'3e1117:
ANSUAL RE*0RT, JANUARY 1,1980, TO CfCDfiER 31 19'O - 2RCWNS Fi23Y NUCLIAR PLANT UNITS 1, 2, AND 3 - DcCKIT NOS. 50-259, 50-250, AND 50-296 -
0 PIRATING LICENSES DPR-33, DPR-52, AND DPR-6d Please refer to our letter dated Fetman 27, 1981 which trsnsmitted the annual opersting report for Browns Ferry unita 1, 2, and 3.
Enclosed is Appendix A, " Water Cuality and Biological Conditions in Wheeler Resenoir During Operation of Browns Ferry Nuclear Plant - January 1,1980-December 31, 1980," to this annual report.
Veq tmly yours, TENNESSEE VALLII AUniORIIT L. M. ft!.lls, Manager Nuclear Hegulation ar.4 Safety Enclosure (2) cc (Enclosure):
Directer (r.0)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Cossaission Washington, DC 20555 Director (2)
Offic;e of %nagement and Proarsa Analysis U.S. Nuclear Regulatory Cesenissica Washington, DC 20555 Director, Nuclear Engineering and Operations Department Electric Power Research Institute P.O. Ecx 10412 Palo Alto, California 94303
^ ;, -
8105050(Old An Ecual Cecortumty Empioyer
.