ML20003H292

From kanterella
Jump to navigation Jump to search
Forwards LER 81-025/01T-0.Detailed Event Analysis Submitted
Date released: 01/17/2020 Download: ML20003H292


LER 81-025/01T-0:on 810413,seismic Analysis of Torus to Reactor Bldg Vacuum Breaker Valves Revealed That Valve Operator Mounting Brackets Did Not Meet Seismic Requirement. Valve AO-2502B Upgraded by Addition of Snubber
ML20003H295
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 04/24/1981
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20003H295 (1)
Forwards LER 81-025/01T-0.Detailed Event Analysis Submitted
ML20003H291
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 04/24/1981
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20003H291 (3)