ML20003H224

From kanterella
Jump to navigation Jump to search
Advises That Fuel Rod Accountability Sys Reviewed in Response to .Revisions Identified Which Will Bring Sys in Line W/Nrc Position Re 10CFR70.58(h).Addl Equipment,Personnel & New Procedures Required.Schedule Encl
ML20003H224
Person / Time
Site: Westinghouse
Issue date: 02/23/1981
From: Sanders C
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Partlow J
NRC
References
18678, REE-CFS-81-009, REE-CFS-81-9, NUDOCS 8105050366
Download: ML20003H224 (2)


Text

D.--;..-_-.......---

....-----.---.---..---.M.------..-...

. -( )

REE-CFS-81-009 ppg

'70 - ll5T

,/

f

.9 h

T}

O N O I/ 5~l W ^'A m

y S

usarr2!cumen Westinghause My

-5,

" 3" *3" gd Electric Corporation :!'.

g

.)

u.5 #h, n.s**'

cruern C !cbiaScurnCarera292',0 c

s g.a.ss aa" o

201 776 2610 d)

A

. February 23, 1981

'G 42 U. S. Nuclear Pegulatory Camission p

 :-

Attn: Mr. James G. Partlow, Chief d

NMs3

-fg 3[

Material Control Li nsing Branch

\\

//

1.,

Gentlemen:

In res;x:nse to your letter dated February 5,1981, we have reviewd our current fuel rod accountability system. System changes ham been identi-fied which will bring the accountability system in line with the present NPC interpretation of 10 CFR 70.58(h).

Incorporation of these iters will require additional equipment, new pro dures, additional personnel train-ing, and alterations in rewrd keeping systers. The canpletion date for these modifications is scheduled for the spring of 1982. hhen operational, this systen will allow us to identify, locate, and quantify fuel rods with-in the operation. In naaition, final values for all fuel assemblies will be available prior to shipment. We plan to begin using this system after the spring 1982 physical inventory.

Attached is a schedule for develo; rent and installation of the new weighing equi;raent which cxrprises the major portion of the nodified accountability system.

SMuld you ham any questien or require any additional inforr& ion, lease contact me.

p l cf

,/

N(

,e ft uu [_)U n

M M

i kg

,nrr 2 71981

' %,,,nower.

C. F. Sanders, Panager

.y co='55*"

x ')/

Padiological & Envirenmental Encineering CI5:lb

.q-Attachnent

~ _....

,'*JL 19678 W 7905050%b

)

~

-[

~

s ATTACHMENT SCHEDULE FOR WEIGHING EQUIP?.ENT 1.

Engineering (design, specification, etc.)

June 1981 2.

Procurement 2.1 Purchase June - July 1981 2.2 Receipt of Equipment August 1981 j

3.

Of f-Line Equipment Checkout September 1981 l

4.

Installation and Debugging December 1981 5.

Implementation of System May 1982 i