ML20003G272

From kanterella
Jump to navigation Jump to search
Forwards LER 81-010/03L-0
Date released: 01/17/2020 Download: ML20003G272


LER 81-010/03L-0:on 810318,diesel Generator 1B Declared Inoperable Following Trip on Overspeed During Surveillance Test FNP-1-STP-28.2.Caused by Blown Fuses in Speed Governor. Fuses Replaced
ML20003G273
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/16/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20003G273 (1)
Forwards LER 81-010/03L-0
ML20003G271
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/16/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20003G271 (1)