The changes to the Technical Specifications are being g S$

LJ

^

requested to:

(1) accommodate the fourth refueling of the Peach Bottom Unit 3 reactor, (2) identify the operating limits for all fuel types for cycle 5 operation, (3) permit the continued use of the fast scram control rod drive during cycle 5, (4) permit continued operation of the Pressurized Test Assembly (PTA) after re-constitution with six (6) new fuel rods, (5) incorporate the 67B control rod drive scram times, (6) accommodate implementation of ODYN transient analysis code into reload licensing, (7) delete certain Technical Specification Eases LOCA information which is redundant to information contained.in other previously submitted documents. (8) incorporate MAPLHGR limits for the Reload 4 fuel and ex.anded exposure MAPLHGR limits for the Reload 2 and Reload 3 fuel, (9) add generic MAPLHGR curve for P8x8R fuel to reduce need for future cycle-dependent revisions, and (10) modify references given in the Bases regarding reload safety evaluations.

An analysis of the safety considerations involved in the reactor refueling and.the cycle 5 operating limits for all fuel types is set forth in a document entitled " Supplemental Reload Licensing Submittal for Peach Bottom Atomic Power Station Unit 3 Reload 4" (Y1003J01A20) February, 1981, which is filed herewith and incorporated herein by reference.

An analysis of the safety considerations involved in continuing the use of the fast scram control rod drive (FSCRD) during cycle 5 is set forth in a document entitled " General Flectric Boiling Water Reactor Reload 1 Licensing Amendment for Peach Bottom Atomic Power Station Unit No.

3, Fast Scram Control

~~

810428.0\\.06

.