Text
.
4/23/81 i
/&
UNITED STATES OF AMERICA 6
NUCLEAR REGULATORY COMMISSION E
APgO'l gg h
.'.y G 4s,Dfh',Nb/
BEFORE THE COMMISSION
/
In the Matter of
)
~\\'O O
CONSUMERS POWER COMPANY Docket flo. 50-155 6
)
(Spent Fuel Pool Modification)
(Big Rock Point Plant)
)
NRC STAFF RESPONSE TO MOTION OF JOHN A. LEITHAUSER FOR EXTENSION OF TIME The Staff of the Nuclear Regulatory Commission (Staff) hereby opposes the motion of Mr. John A. Leithauser for an extension of time to file his " appeal" of the decision of the Atomic Safety and Licensing Appeal Board (Appeal Board) in Consumers Power Company (Big Rock Point Plant),
ALAB-636, NRC
, (March 31, 1981), on two grounds. These grounds are:
- 1) Mr. leithauser is not a party to the proceeding entitled to file a petition for Commission review; and 2) even if Mr. Leithauser were a party to this proceeding, his motion for extension of time should not be granted since it was filed after the due date for a petition for Commission review in this proceeding.
DISCUSSION In ALAB-636 the Appeal Board accorded Mr. Leithauser the status of a non-party participant for the purposes of this appeal. The Appeal Board specifically noted that its procedural orders referring to Mr. Leithauser as an "intervenor" did not constitute a sua sponte reversal of the 810424OBfeo 6
L
Licensing Board's denial of his petition to intervene. ALAB-636, supra, slip op, at 14, fn.10. ~~1/ 10 C.F.R. 5 2.786(b)(1) of the Comission's regulations sets forth the method for seeking Commission review of an Appeal Board's action. That regulation states that a party may seek such review within 15 days of the service of the Appeal Board decision.
Since Mr. Leithauser is not a party to this proceeding there is no need to grant him an extension of time to file a petition for review of ALAB-636.
Even if Mr. Leithauser were considered a party to this proceeding, his motion should not be granted.since it was received after the due date for petitions for Commission review.
It is Comission practice that requests for extension of time must be received by the tribunal before whom the proceeding is pending at least one day prior to the filing date in question.
See Appendix A to 10 C.F.R. Part 2, Section IX(d)(3);
Virginia Electric and Power Company (florth Anna Nuclear Power Station, Units 1 and 2), ALAB-568, 10 NRC 554 (1979).
Since Mr. Leithauser did not follow this procedure, his motion should not be entertained.
His remedy would be to submit his pleading accompanied by a motion to file that pleading out of time.
t y On itarch 10, 1981, Mr. Leithauser filed a motion before the Comission for official notice of his opinion of his status in this proceeding.
To the Staff's knowledge there has been no Comission action on this motion as yet.
In response to that motion the Staff took the position that if any clarification were necessary of Mr. Leithauser's status, the motion should be referred to the Licensing Board. The Appeal Board decisina in ALAB-636 has rendered any such referral unnecessary.
Mr. Leithauser's status has been clarified.
2/ Although this sectic a specifically mentions the Appeal Board, the procedure it sets forth has been followed with respect to other tribunals.
J m
. V CONCLUSI0t1 for the reasons set forth above, tir. Leithauser's motion for a seven day extension should be denied.
Respectfully submitted, Ll bb[t __ M IM Janice E. Moore Counsel for f4RC Staff Dated at Bethesda, Maryland this 23rd day of April,1981.
9
O IINITLD SiAILS OF A S ICA i'UrLI~ AR PEC'JLATORY CO'. *1'N UN lil. FORE Tile COMit!SS101 In the !!atter of
)
i ".'<lb1LRS POWER C0:1PN4Y Pocket No. 50-155
)
(:lig Rock Point Plant)
)
(Spent Fuel Pool i:odifie.ation)
CERT.lFICATE _OF SER'/ ICE, I hereby certify that copies of HRC STAFF RESPONSE TO MOTION OF JOHN A.
LEITHAUSER FOR EXTENSION OF TIME in the above-captioned proceeding have been served on the following by deposit in the United States mail, first class or, as indicated by an asterisk, through deposit in the Nuclear Regulatory Commission's internal mail system, this 23rd day of April, 1981.
Ti.0: a s S. l bore, Chain.ian
'Mr. frederick J. Shon lite ic Saf. ty and 1.icensing Atc lic Safety and licens ing Acccal Feard E:ard
- 11. 9 *:oclear Regulatory Connission ll.S. ! uclear Regula tory Co. :.ission lashington, D. C.
PO%S tla s!,ington, D. C.
20SSS
- Dr. Jchn H. Buck Philip P. Steptoe, Esq.
.'st e. ic Sa fety and Licens ing Mic? ael I. Miller, Esq.
.sc, al.0.:rd Is! am, Lincoln & Scale ll.S. ::xicar Regulatory Coc.nission Cne first !!aticnal Plaza
..a s;.i ngt o n, D. C.
POSSS
' Suite 4700 Chicago, Illinois 60503 Christine N. Kohl
- tc. ic Safety and I iccusing Jos aph Gallo, Esq.
l s
.'cc al Baird Is1.2m, Lincoln & Beale ti.S. *:xicar Regulatory Co.wission 112 0 Ccnnecticut Ave., N.W.,.=375
'la3M.gton, D. C.
P05SS
!?a s hington, D. C.
20036 l
- 'i r: crt Grcss: in, Esq., Chiin in
.0!.o A. I.eithauser l
ftc ic Safety and I.ic. nsing b
1 ei thauser and leit' tuser, P.C.
i l
'c rd C,u l Pla/a, Suite 212 ti.5. *: elcar Regula tory Connission 13.:J1 Eight Mile Rn d
' *.:! o n, D. C.
. 0:.SS fa s t P.> t roi t, til
- '021 l
'Pr.
.'s,ar H. Paris
. 0! 10" eill, II l
M-ic Saf. ty anii I ici ns ing P.O..te 7, Fox 44 l
.id I*af. e Ci ty, Michic2n 3 54 l
LI.S. ';e1. r ".gulaI.ry Co..is i.'n
. i %S
!!n'
,.co, ii. C.
'1
1'. 1 t a :'iria C.
!'o'. I e r 1:n i gh t, Et q.
de /, Fox 103c Ac f.ing Geoc ral Coun.cl C1.rli.-.olv, 111 49/F0 Co ncil on rovircon.cn'.,
Q:a1i ty i k.
.'o.*so ne B i e r
/22 Jackson I' lace, ii.W.
I t. lint"n
at hington, D. C.
20005 c' rlc wiv, III 49/20 Me. Cordon liowie 7,
- ic c.if. ty a nil I. icros ing all Pine
',,.11 reard ranel "o).e City,Iil 49/12 ti.s. ':".:1..ir P gula t ory r.miss ion h i:.u t en D. C.
70%$
'r.
Jin l' ills To;te 2, Fox 103 M...ic Sa fety and I.imus ing Cl.irlevoix, !il 49/20
'.:rd ranel ti.S. iNeli a r Regulat ory Ce:.niission Jai 2s Olson, Esq.
shingt on, D. C.
PO!.f.5 P. O. Fox 561 Tra.orse City, Ilichigan 49504
'.c!..:t ing..nd S. rv ice Sec t ion II.S. ::acli ar Pc. fila t ory Co....aiss ion
!!erbert Sernmel, Esq.
'?
hingit n, D. C.
20 % S
'Jrhn Law Institut.e of i
The Antioch School of Law ifr. ilc.as ri. inn 1624 Crescent Place, N.W.
.7c d e 3, "ex.;41
-las hington, D. C.
20009 Cl.ir b eix, ::I 49/70
& M I.. Sacon, Esq.
Cens :.ars PO.er Co.
712 *l st Fichigan Ave.
J. d.< ;n, ;11 49r01
'Mr. Samuel J. Chilk Secretary of the Connission 11.S. Nuclear Regulatory Conmission
'lashington, D. C.
20555 s
- Leonard rickwit, Esq.
General Counsel ll.S. fluclear Regulatory Conmission
!!ashington, D. C.
20555 d 'bMk Mb Janice E. Moore s
N Counsel for NRC Staff P00R ORIGINAL