OPERATING DATA REPORT DOCKET NO 50-293 DATE 4/6/81 COMPLETED BY G. G. Whitney TELEPHONE (617)746-7900 OPERATING STATUS

-l _

}

1. Unit Name:

Pilerim I

~' Notes i

2. Reporting Period:

March. 1981

3. Licensed Thermal Power IMWr t:

1998-

4. Nameplate Rating (Gross MWel:

6 78.

655.

5. Design Electrical Rating (Net MWe;:
6. Maximum Dependable Capacity (Gross Mhen:
7. Maximum Dependable Capacity (Net MWel: 670.

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reamns:

None

9. Power Level To which Restricted.If Any(Net MWer None
10. Reasons For Restrictions.lf Any:

^

l 4

1 This Month Yr to.Date Cumulative i

11. Hours In Reporting Periou 744.0 2160.0 72840.0
12. Number Of Hours Reactorwas Critica]

517.5 1893.4 52078.0

13. Reactor k-serve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator Oa.Line 502.5 1868.6 50375.5
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 i
16. Gross Thermal Energy Generated (MWH) 976632.0 3273792.0 85563168.0 17 Gross Electrical Energy Generated (MWH) 339660.0
18. Net Electrical Energy Generated (MWH) 326942.0, _,

1098030.0 28427394.0 _

1055967.0 27306574.0

19. Unit Service Factor 67.5 86.5 69.2
20. Unit Availability Factor 67.5 86.5 69.2-
21. Unit Capacity Factor (Using MDC Nett 65.6 73.0 56.0-
22. Unit Capacity Factor IUsing DER Net) 67.1 74.6 57.2
23. Unit Forced Outage Rate n0 15 10.1
24. Shutdowns Scheduled Over Next 6 Montr.s (Type. Date.and Duration of Esche None
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

"a 4

  • naan *4 n g
26. Units in Test Status (Prior to Commercial OperationI:

Forecast Achiesed INITIAL CRITICALITY i

INITIA L ELECTRICITY COMMERCIA L OPERATION 0433 0N t

.., _. _ _... -., -. _... ~ _ _.. _ ~. - - -, _, _ _,. _. -. _. _.,. _. _...,., _.. _ _. _ - _.,. - _. _. _ _. _. -.,. _ -. _

AVE?. AGE DAILY UN;T ?OwER LD'EL 50-293 DOC C NO.

Pilgri.t I 4/6/81 DAS I

COM?LE3D 3Y (617)746-7900 TELE? HONE March 1981 MONTH -

DAY AVERAGE DAILY ?O *ER LEVEL DAY AVERAGE DAILY POWER LDT.L (Mw.Ne:s (Mwe-Ne:s e

g 0

g-670 0

668 IS 668 O

g9 0

665 4

,0 0

5 21 646 0

582 6

0 669

,3 670 0

4 g

0 667 9

0 25 665 10

~

11

<*R 665 3

663 l

12 671 582 la.

.9 671 673 30 g4 671 670 12 21 670 16 INSTRUCT 10NS Cn th:s forest.!is: :he ave age 425y r.:: power leve!in MWe-Net for each v.2y in :he reper::ng munta. Cam:ure :o

he neares: wncie meg 2 watt e,- i c

l 1

..m.

IlNil hilullHlWNS AND POWI H Hi:lilH"llONS INNIII NU:

UNil N AMI.

PilErlm L,_

H A'll:

la/6/H1 COMPI 1 1118 itY _ C.C. lJhituuy.

HI POH 1' MON ill. March._ L'181 g g;g,g.PilONii (61.7)?46:1900 l

c E E EE I scensec

[ s, E*.

Cause & Ciniettive No.

Date Q

5g 3

.2 s 5 livent y?

fO3 At thin to yE jj y, Hepust #

in v.

Pecse:u itetinsenic 6-o u

6 j

l 5

81/02/28 S

241.5 15 1

N/A ilB llTl!XCll tinit shutdown to install bypass of

]

4 tli point heat exclianger.

4 i

i i

i 1

i 4

i i

i 1

I 2

3 4

I': l'oe ccal Re.ison:

Methoil:

1.minini G. Insinn nuns I

S: Silicif uleil A-1:iinspinent F.ninse (linplaint I -Manual Ios Perpasalion ul llas.

Il-Maintenance of Test 2 Mannat Sciain.

I ning Slicces fin iscen w C-Refueling 3 Antoni. Hic Sesani.

B seni Repnet il i 10 l ile INilH8 G i

l l} Hegn!4:nsy Hessettison 4 Othes (limplaint allbil i

1 Opesatus it.uning & I ascuse i vinination 12 Atiminisiaalive 5

)

G Opciatonial i seus il apl.nni i shiins i S.nne Nine. c t*8/ / / l ll Othes H spl.nni i

6

Q

~

3 PILGRIM NUCLEAR POWER STATION

SUMMARY

OF OPERATIONS for MARCH 1981 On Nrch 1,1981, the Unit was off line for tube plugging the "B" 4th Point Feedwater heater, installing a bypass around the 4th point heater, and re-placement of the RCIC inboard isolation valve (M01301-16). The reactor was brough critical at 1331 hours0.0154 days <br />0.37 hours <br />0.0022 weeks <br />5.064455e-4 months <br /> on Nrch 10 and the generator was synchronized to the grid at 0132 hours0.00153 days <br />0.0367 hours <br />2.18254e-4 weeks <br />5.0226e-5 months <br /> ~on March 11, and unit returned to 100.' power.

The unit operated on 100% with minor trimhg for condenser delta t.

- pe rature and control rod exercises until March 21 when power was reduced to 50% for a condenser backwash. The unit was returned to 100% and remained there until March 28 when power was again reduced to 50% for another backwash. Following the backwash, the unit was returned to 100% and remained there for the rest of March.

1 Safetv/ Relief Valve Challenges Month of March 1981 Requirement: TMI T.A.P. II.K.3.3 No challenges for the month.

Pfl.CRIH IHICl.EAll PotJER STATION llONTil MARCil 1981 MA.10R SAFETY l(El.ATED HAINTENAtlCE e

I CORRECTIVE ACTION SYSTEH COMPONENT HALFUNCTION CAllSE HAINTEllANCE To PREVENT RECllRRENCE ASSOCIATED L i

HD 1301-16 liigh Haintenance liigh Hain-Replaced Valve Replaced Valve with Superior Valve e

Item tenance Vv j

HD 202-4A Packing Leak Hormal Hepacked R& packed with Preformed Packing H0 202-5A Packing 1.eak Normal Hepacked Repacked with Preformed Packing i

Ho 202-4B Packing Leak Nortaal Repacked Repacked with Preformed Packing Ho 202-5B Packing Leak Hormal Repacked Repacked with Preformed Packing HO-2301-5 H.O. Failed Gear Repaired Motor First incident at Station, Vendor Jammed Operator reports that it was not a common failure

'no further action i

i I

3 e

1 i

i

,f e

r o

"O I

22.: m ING IEO?l!ATICN The folicwing refueling inic:=a 1== is included in he Men:hly Report as requested is a le::e :o Mr. G. C. Andog d d da:ed January 18, 1978:

yor your ccevenience, the infor:atice supplied has been enu= ara:ed so cha:

each su=ber cc::espcuds to equivale : no:a:10: u-did:ed i: the reques:.

1.

  • he =ame of -lis fac q is ?il ri= Nucles: ?cuer S:2: ice, "ocke:

Nu=ber 50-293.

2.

Scheduled da e for nex: Refueling Shu:deve:

Septa =ber, 1981 3.

Scheduled da:e fe: res:ar: fc11: wing refueling:

4.

5.

Due c -leir sd-d'arin, reques:s 4, 5, & 6 are responded to ecliec:17ely:

6.

  • he fuel, which had been leaded during :he 1980 scheduled refueling cc: age, is of the new ?SxSR design, :: sis:ing of app:cxi=a:ely 64

?ER32S2 asse=blies and 120 ?DR3065 asse=blies.

7.

(a)

There are 580 fuel asse=blies in : e core.

(b) here are 764 fuel asse=blies 1: :he spes: fuel pecl.

3.

(a)

"he sa:10: is prese::17 licensed. s:cre 2320 spe : fuel asse=blics.

The ac:ual span: fuel s::: age capacin is 1770 fuel asse:blies a:

present.

(b)

The p1 =- ed spes: fuel s::: age capacip is 2320 fuel asse=blies.

9.

Wi-2 presen: spen: fuel in s::: age, -le spen: fuel peci cew has -le capaci:7 :o ace :=cda:e an addi.iceal ICC6 fuel asse=blies.

I l

{

l l

v

---7.-.

,ww..

m - - -- - -, --

.--,s

--,-,-p 9,

,y-s m...%q..

,m-,

,,,,.q__--

.s-s

-g

-