Monthly Operating Rept for Mar 1981
ML20003F815
Person / Time
Site: Pilgrim
Issue date: 04/06/1981
From: Whitney G
BOSTON EDISON CO.
To:
Shared Package
ML20003F811 List:
References
NUDOCS 8104230642
Download: ML20003F815 (6)


Text

. _ ;m _. _ _ _ _ . _ . __ _ _

s CA ,

O OPERATING DATA REPORT DOCKET NO 50-293 DATE 4/6/81 COMPLETED BY G. G. Whitney TELEPHONE (617)746-7900 OPERATING STATUS

-l _

}

1. Unit Name: Pilerim I ~' Notes i 2. Reporting Period: March. 1981 -
3. Licensed Thermal Power IMWr t: 1998- '
4. Nameplate Rating (Gross MWel: 6 78.
5. Design Electrical Rating (Net MWe;: 655.
6. Maximum Dependable Capacity (Gross Mhen:
7. Maximum Dependable Capacity (Net MWel: 670.

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reamns:

None

9. Power Level To which Restricted.If Any(Net MWer None
10. Reasons For Restrictions.lf Any: ^

l 4

1 This Month Yr to.Date Cumulative i 11. Hours In Reporting Periou 744.0 2160.0 72840.0

12. Number Of Hours Reactorwas Critica] 517.5 1893.4 52078.0

, 13. Reactor k-serve Shutdown Hours 0.0 0.0 0.0

14. Hours Generator Oa.Line 502.5 1868.6 50375.5
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 i 16. Gross Thermal Energy Generated (MWH) 976632.0 3273792.0 85563168.0 17 Gross Electrical Energy Generated (MWH) 339660.0 1098030.0 28427394.0 _
18. Net Electrical Energy Generated (MWH) 326942.0 , _ , 1055967.0 27306574.0
19. Unit Service Factor 67.5 86.5 69.2
20. Unit Availability Factor 67.5 86.5 69.2-
21. Unit Capacity Factor (Using MDC Nett 65.6 73.0 56.0-
22. Unit Capacity Factor IUsing DER Net) 67.1 74.6 57.2
23. Unit Forced Outage Rate n0 15 10.1
24. Shutdowns Scheduled Over Next 6 Montr.s (Type. Date.and Duration of Esche None
25. If Shut Down At End Of Report Period. Estimated Date of Startup: "a 4
  • naan *4 n g
26. Units in Test Status (Prior to Commercial OperationI: Forecast Achiesed i

INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIA L OPERATION 0433 0N __

t

. . , _ . _ _ . . . - . , - . _ . . . ~ _ _ . . _ ~ . - - - , _ , _ _ , . _ . - . _ . _ . , . _ . _ . . . , . , _ . . _ _ . _ - _ . , . - _ . _ . _ _ . _ . - . , . _ - . _

AVE?. AGE DAILY UN;T ?OwER LD'EL DOC C NO. 50-293 Pilgri.t I DAS 4/6/81

  • I COM?LE3D 3Y TELE? HONE (617)746-7900 March 1981 MONTH -

DAY AVERAGE DAILY ?O *ER LEVEL DAY AVERAGE DAILY POWER LDT.L (Mwe-Ne:s (Mw e.Ne:s g 0 g- 670 0 668

. IS 668

. O g9 4

0 ,0 665 0 646 5 21 0 ., 582 6

0 669

, ,3 g 0 ;4 670 0 , 667 9

10 0 25 665

~

11  :- <*R l 12 665 3 663 671 , 582 la. .9 g4 673 30 671

. 671 . 670 12 21 670 16 INSTRUCT 10NS Cn th:s forest.!is: :he ave age 425y r.:: power leve!in MWe-Net for each v.2y in :he reper::ng munta. Cam:ure :o

he neares: wncie meg 2 watt ec ,- i l

1

IlNil hilullHlWNS AND POWI H Hi:lilH"llONS INNIII NU: PilErlm L,_

UNil N AMI.

H A'll: la/6/H1 COMPI 1 1118 itY _ C.C. lJhituuy.

< HI POH 1' MON ill . March._ L'181 g g;g,g.PilONii (61.7)?46:1900 l

.. c

EE I scensec [ s, E*. Cause & Ciniettive
, EE No. Date Q 6-5g yE 3

.2 s 5 jj y, livent Hepust #

y?

in v. fO3 o

At thin to Pecse:u itetinsenic .

u

! 6 j .

l 5 81/02/28 S 241.5 15 1 N/A ilB llTl!XCll tinit shutdown to install bypass of 4 tli point heat exclianger.

]

4 i

i i

i 1

i 4

i i

i 1

. I 2 3 4

. I': l'oe ccal Re.ison: Methoil: 1.minini G . Insinn nuns I

S: Silicif uleil A-1:iinspinent F.ninse (linplaint I -Manual Ios Perpasalion ul llas.

Il-Maintenance of Test 2 Mannat Sciain. I ning Slicces fin iscen w i C-Refueling 3 Antoni. Hic Sesani. B seni Repnet il i 10 l ile INilH8 G l l} Hegn!4:nsy Hessettison 4 Othes (limplaint allbil i

1 Opesatus it.uning & I ascuse i vinination

. 12 Atiminisiaalive 5 G Opciatonial i seus il apl.nni i shiins i S.nne Nine. c

) ll Othes H spl.nni

t*8/ / / l i

6

~ Q 3

PILGRIM NUCLEAR POWER STATION

SUMMARY

OF OPERATIONS for MARCH 1981 On Nrch 1,1981, the Unit was off line for tube plugging the "B" 4th Point Feedwater heater, installing a bypass around the 4th point heater, and re-placement of the RCIC inboard isolation valve (M01301-16). The reactor was brough critical at 1331 hours0.0154 days <br />0.37 hours <br />0.0022 weeks <br />5.064455e-4 months <br /> on Nrch 10 and the generator was synchronized to the grid at 0132 hours0.00153 days <br />0.0367 hours <br />2.18254e-4 weeks <br />5.0226e-5 months <br /> ~on March 11, and unit returned to 100.' power.

The unit operated on 100% with minor trimhg for condenser delta t. - pe rature and control rod exercises until March 21 when power was reduced to 50% for a

- condenser backwash. The unit was returned to 100% and remained there until March 28 when power was again reduced to 50% for another backwash. Following the backwash, the unit was returned to 100% and remained there for the rest of March.

1 Safetv/ Relief Valve Challenges Month of March 1981 Requirement: TMI T.A.P. II.K.3.3 No challenges for the month.

Pfl.CRIH IHICl.EAll PotJER STATION llONTil MARCil 1981 ,

, MA.10R SAFETY l(El.ATED HAINTENAtlCE e

I CORRECTIVE ACTION SYSTEH COMPONENT HALFUNCTION CAllSE HAINTEllANCE To PREVENT RECllRRENCE ASSOCIATED L i .

HD 1301-16 liigh Haintenance liigh Hain- Replaced Valve Replaced Valve with Superior Valve e j Item tenance Vv HD 202-4A Packing Leak Hormal Hepacked R& packed with Preformed Packing H0 202-5A Packing 1.eak Normal Hepacked Repacked with Preformed Packing i

. Ho 202-4B Packing Leak Nortaal Repacked Repacked with Preformed Packing Ho 202-5B Packing Leak Hormal Repacked Repacked with Preformed Packing HO-2301-5 H.O. Failed Gear Repaired Motor First incident at Station, Vendor

Jammed Operator reports that it was not a common failure 'no further action i

i I

  • e 3

1 i

i

,f e

r o

"O I

22.: m ING IEO?l!ATICN The folicwing refueling inic:=a 1== is included in he Men:hly Report as requested is a le::e :o Mr. G. C. Andog d d da:ed January 18, 1978:

yor your ccevenience, the infor:atice supplied has been enu= ara:ed so cha:

each su=ber cc::espcuds to equivale : no:a:10: u-did:ed i: the reques:.

1. *he =ame of -lis fac q is ?il ri=. Nucles: ?cuer S:2: ice, "ocke:

Nu=ber 50-293.

2. Scheduled da e for nex: Refueling Shu:deve: Septa =ber, 1981 -
3. Scheduled da:e fe: res:ar: fc11: wing refueling: -

4.

5. Due c -leir sd-d'arin, reques:s 4, 5, & 6 are responded to ecliec:17ely: ,
6. *he fuel, which had been leaded during :he 1980 scheduled refueling cc: age, is of the new ?SxSR design, :: sis:ing of app:cxi=a:ely 64

?ER32S2 asse=blies and 120 ?DR3065 asse=blies.

7. (a) There are 580 fuel asse=blies in : e core.

(b) here are 764 fuel asse=blies 1: :he spes: fuel pecl.

3. (a) "he sa:10: is prese::17 licensed . s:cre 2320 spe : fuel asse=blics.

The ac:ual span: fuel s::: age capacin is 1770 fuel asse:blies a:

present.

(b) The p1 =- ed spes: fuel s::: age capacip is 2320 fuel asse=blies.

9. Wi-2 presen: spen: fuel in s::: age, -le spen: fuel peci cew has -le capaci:7 :o ace :=cda:e an addi.iceal ICC6 fuel asse=blies.