ML20003F192

From kanterella
Jump to navigation Jump to search
Interim Rept of Significant Const Deficiency 27, Switchgear Breaker Position Switch Operator Defect,Initially Reported on 810313.Switch Operator Guide to Be Adjusted for Breaker Installation & Alignment.Final Rept by 810731
ML20003F192
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/13/1981
From: Aswell D, Hart J, Hartnett R, Milhiser R, Wills J
LOUISIANA POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K81-0147, NUDOCS 8104200376
Download: ML20003F192 (3)


Text

.

  • 1 e

ISIANA 242 P O W E R & LI G H T! a c.esL2aaNes srassr LOJISIANA 70174 . (5C41368-2345 ecx socs . New CatsANS.

Mio0Ls south ur:ures svs:sv April 13, 1981 v.c. w.%, w W3K81-0147 Q-3-A35.07. 27 Mr. K. V. Seyfrit, Director, Region IV v U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement S.'[N '

y g(t- , SL fd 611 Ryan Plaza Drive, Suite 1000 ~

B g\ w- C Arlington, Texas 76012 , - 7, d g en il s

    1. . ie#'d$

C Vj\

SU3 JECT: Waterford SES Unit No. 3 cC U

Docket No. 50-3 82 /fx Interim Report of f.v P '

N'6 Significant Construction Deficiency No. 27 "Switchgear Breaker Position Switch Operator Defect"

REFERENCE:

Telecon - L. L. Bass (LP&L) to R. C. Stewart (NRC) on March 13, 1981.

Dear Mr. Seyfrit:

In accordance with the requirements of 10CFR50.55(e), we are hereby providing two copies of the Interim Report of Significant Construction _ eficiency No.

27, "Switchgear 3reaker Position Switch Operator Defect."

If you have any questions, please advise.

Yours very truly,

/~

/, ,- .

~i. a:. u . j. Y2. G y,,

D. L. Aswell, Vice President Power Production DLA/LL3/ned cc: 1) Director Office of Inspecti.on & Enforcement U. S. Nuclear Regulatory Commission l

Washington, D. C. 20555 gU O,j 7 i (with 15 copies of report)

.S

2) Director Office of Management Infor=ation and Program Control / f

) U. S. Nuclear Regulatory Coc=ission I Washington, D. C. 20555 (with I copy of report) 810 4 20 0 ?>3%

i LOUISIANA POWER & LIGHT COMPANY WATERFORD SES UNIT NO. 3 Interim Report of Significant Construction Deficiency No. 27 "Switchgear Breaker Position Switch Operator Defect" Reviewed by /0 [

R. J. -t!TTnTser - Site Manager Date

' ~

Reviewed by /

Date J[L.' Mills - Project Superintendent Reviewed by M . 8 ['8-M/

Date

~

J./ Hart - Project.Lpens'in'g Engineer Reviewed by 4 / ~/ "h R. .C Hartnett'- Q.#A. Site Supervisor Date April 10, 1981

O INTERIM REPORT SIGNIFICANT CONSTRUCTION DEFICIENCY No. 27 "Switchgear Breaker Position Switch Operator Defect" Int'roduction This report is submitted pursuant to 100FR50.55(e). It describes a deficiency in the 4116 KV Class IE Switchgear as modified and installed and is related to Significant Construction Deficiency Report No.- 11 titled "Switchgear Breaker Position Switch Operator Defect."

Description ,

On Marc.h 13, 1981, Louisiana Power & Light Company's Startup Organization advised Ebasco Services, Inc., of a problem with the as-installed breaker position switch operator mechanisms. This deficiency is documented on Nonconformance Report No. W3-2574.

The extent of the deficiency is as follows: The breaker position switch operators have been modified in accordance with Significant Construction Deficiency No. 11 and installed under General Electric's supervision. During sobsequent installation of the breakers, an interference was detected between the operator guide and the breaker arc chute covers which prevents breaker insertion in the gear. This deficiency involves thirty-three (33) breaker position switch operators.

Safety Implications The'as-installed modified breaker position switch operators with the added guides prevent the breakers from being inserted into their respective location.

Therefore, this deficiency if lef t uncorrected could result in an inadequate installation and is considered to be a reportable item under 10 CFR 50.55 (e).

Corrective Action Corrective action required is in the form of an adjustment to the switch operator guide location to permit installation and alignment of the breakers.

The necessary adjustments will be completed and a final report submitted on or before July 31, 1981.

l l

l l

l l

l

'