ML20003F176

From kanterella
Jump to navigation Jump to search
Forwards Final Technical Evaluation Rept, Equipment Environ Qualification
ML20003F176
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 04/15/1981
From: Carfagno S
FRANKLIN INSTITUTE
To: Butcher E
NRC
Shared Package
ML20003F177 List:
References
CON-NRC-03-79-118 NUDOCS 8104200351
Download: ML20003F176 (1)


Text

,

d

_ Franklin Institute Research Laboratory, Inc.

j A Subsidiary of The Franklin Institute

[ 91 3 WQ4 s April 15, 1981 8f a4%4 dgN a

L$

~

D 8

United States Nuclear Regulatory Commission Washing ton, D.C.

20555 4 '"

Attention:

Mr. Edward J. Butcher, Jr.

Project Officer (MS 416)

Reference:

Utility:

Dairyland Power Cooperative Plant Name:

La Crosse Boiling Water Reactor Docket No.:

50-409 NRC TAC No.:

42522 NRC Contract No.:

NRC-03-79-ll8 FRC Project No.:

CS257 FRC Task No.:

203 Project:

SEP Plants Electrical Equipment Environmental Qualification (EEQ)

Subject:

Final Technical Evaluatior Report - Formal Issue Equipment Environmental Qualification

Dear Mr. Butcher:

Enclosed please find the Final Technical Evaluation Report on the referenced subject.

Very truly yours,

// [$c r

S.

P. Carfagno Projcct Manager SPC/CJC/cm Enclcsure cc:

Z.

Rosztoczy - Letter only J.

Lombardo - 5 Reports P. DiBenedetto - Letter only y

KOO4 s

///

8104200 3 { \\

~.

.~.

_ _.. _ _ _. _, _