ML20003E843
| ML20003E843 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 04/09/1981 |
| From: | Marilyn Evans BALTIMORE GAS & ELECTRIC CO. |
| To: | Conner E Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8104170367 | |
| Download: ML20003E843 (1) | |
Text
'
B ALTIMORE l GAS AND LECTRIC
/
CHARLES CENTER. P.O. BOX 1475 BALTIMORE. MARYLAND 21203 ELECTRec ENGINEERING oEPARTMENT h' I ll.,_
Mr. E. L. Conner, Jr.
g v '.'f Office of !!aclear Reactor Regulation
& f p '
'j Oeerating Reactors Branch.83
..Q e
Division of Licensing
- **3 #
-i
[
'5 3 6.,
~[@
U. S. IIuelear Regulatory Commission Washington, D. C.
20555
\\'t!,, **
Sub, ject: Calvert Cliffs IIuelear Power Plant M
Units ?!os.1 & 2, Dockets 'Tos. 50-317 & 50-318 Unit 1/ Unit 2 Technical Seecification
Dear Mr. Conner:
3.e information given below should be used as input for your administrative update of Calvert Cliffs Units IIos.1 and 2 technicrd f
specifications:
1.
For dnit 1, specification 3.2.5 is deleted and specification 3 2.6 is co parable to Unit 2 specification 3 2.5 2.
Both units, specification 3.10.2 makes reference to 3.1.3.2 and 3.1.3.7.
ITo such numbers exist.
3.
For Unit 2, specification 3.10.2 does not allow the suspension of the requirements of 3.2.h; Unit 1 does make such allevance.
l L.
Specification 3.1.3.h; Unit 1 specifies CFA drop time.5 3.0 seconds.
?oth units should be 3.1 seconds.
Very truly yours, C
M i
y Michael H. Evans Engineer 5
"uclear Licensing i Ar.alysis Unit l
lo I'HE/ san l
81041703(r7 f