Advises That Conceptual Design for Integrated Emergency Response Facility Will Be Provided by 810601 Due to Receipt of NUREG-0696 on 810311
ML20003E739
Person / Time
Site: Pilgrim
Issue date: 03/30/1981
From: Morisi A
BOSTON EDISON CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0696, RTR-NUREG-696 81-70, GL-81-10, NUDOCS 8104100356
Download: ML20003E739 (1)


Text

.

Y' EOSTON EO4 SON COMPANY aumen.6 ornce. eco sort. tow avessy

.o.,o...............,

^ 1

  • L

~

NUCLEAR OPERATlONS SUPPORT DEPARTMENT March 30,1981 "I

e BECo. Ltr. #817 A

Mr. Darrell G. Eisenhut, Director 8 gggF Division of Licensing 6;

gg0 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.

20555

/,

License No. DPR-35 Docket No. 50-293 BECo Response to Post TMI Requirements for the Emergency Operation Facility (Generic Letter #81-10)

Reference :

(a) NRC Letter dated February 18,1981 " Post TMI Require-ments for the Emergency Operation Facility"

Dear Sir:

Reference (a) requested operating reactors to commit to the implementation dates indicated in Enclosure 1 to Reference (a) and for any date that cannot be met to furnish a proposed revised date and justification for the delay. In order to adequately identify any deviations from the requirements it was first necessary to develop the conceptual design for an integrated Emergency Response Facility which in turn was not possible until the requirements of NUREG 0696 became finalized.

Therefore, due to our receipt of the final version of NUREG-0696 on March 11, 1981, we will provide by June 1,1981 our conceptual design for an integrated Emergency Response Facility.

It will include a description of the Technical Support Center (TSC), Emergency Operations Facility (EOF), and the Emergency Response Facility Data Acquisition Systems (ERFDAS) which will include a Safety Parameter Display (SPDS). All deviations from 0696 will be identified and justification provided for them. We will also provide implementaticn schedules based on equipment availability and construction schedules.

We believe this position to be responsive to your requirements, however, should you have need for additional infonnation, please contact us imediately.

Very truly yours, s