EfER1A1. TRANSMITTED HEREWITH c(7# "%,'o CONTAINS 2.70lHFORMAT10N UNITED STATES t /
NUCLEAR REGULATORY COMMISSION
~
o E
REGION ll g
[
101 MARlETTA ST N.W., SulTE 3100 g
ATLANTA, GEORGIA 3o3o3 AeR 06198f Report No. 70-1151/81-02 Docket No. 70-1151 License No. SNM-1107 Safeguards Group 111 Licensee: Westinghouse Electric Corporation Nuclear Fuel Division Columbia, SC 29205 Facility Name: Westinghouse Nuclear Fuels Division, Columbia Plant Inspection at:
Columbia, South Carolina Inspection Conducted:
March 10-13, 1981 Type of Inspection:
Unannounced Material Control & Accounting Inspector:[-//,,
'/
f
/
- p. Bates 7 Tafeguards Chemist
'Date' Si gned Approved by:
E(% c
- 4/3 /El E. J. McAlpine, Chhef, Material Control and Date Signed Accounting Section, Technical Inspection Branch Division of Engineering and Technical Inspection Inspection Summary Areas Inspected:
Measurement control program, facility organization, independent inspection effort and follow-up on previous identified findings.
The inspection involved 25 inspector hours on site by one NRC inspector and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements within the four areas examined during the inspection.
v S-F2 )
- d5 810 ROD l l //
7 copy or copies 8
Pages This Document is not to be
$o E ((
MTUMI.TRANSWITED HEREWITH a> pro CONTAINS 2.790 INFORW. TION -j