ML20003E712

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 70-1151/81-02 on 810310-13.No Noncompliance Noted.Major Areas Inspected:Measurement Control Program,Facility Organization & Followup on Previous Findings.Details Withheld (Ref 10CFR2.790)
ML20003E712
Person / Time
Site: Westinghouse
Issue date: 04/03/1981
From: Bates J, Mcalpine E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20003E709 List:
References
70-1151-81-02, 70-1151-81-2, NUDOCS 8104100114
Download: ML20003E712 (1)


Text

.. _ _

EfER1A1. TRANSMITTED HEREWITH c(7# "%,'o CONTAINS 2.70lHFORMAT10N UNITED STATES t /

NUCLEAR REGULATORY COMMISSION

~

o E

REGION ll g

[

101 MARlETTA ST N.W., SulTE 3100 g

ATLANTA, GEORGIA 3o3o3 AeR 06198f Report No. 70-1151/81-02 Docket No. 70-1151 License No. SNM-1107 Safeguards Group 111 Licensee: Westinghouse Electric Corporation Nuclear Fuel Division Columbia, SC 29205 Facility Name: Westinghouse Nuclear Fuels Division, Columbia Plant Inspection at:

Columbia, South Carolina Inspection Conducted:

March 10-13, 1981 Type of Inspection:

Unannounced Material Control & Accounting Inspector:[-//,,

'/

f

/

p. Bates 7 Tafeguards Chemist

'Date' Si gned Approved by:

E(% c

- 4/3 /El E. J. McAlpine, Chhef, Material Control and Date Signed Accounting Section, Technical Inspection Branch Division of Engineering and Technical Inspection Inspection Summary Areas Inspected:

Measurement control program, facility organization, independent inspection effort and follow-up on previous identified findings.

The inspection involved 25 inspector hours on site by one NRC inspector and was begun during the regular hours.

Results: The licensee was found to be in compliance with NRC requirements within the four areas examined during the inspection.

v S-F2 )

- d5 810 ROD l l //

7 copy or copies 8

Pages This Document is not to be

$o E ((

MTUMI.TRANSWITED HEREWITH a> pro CONTAINS 2.790 INFORW. TION -j