ILLUMINATING SLDG. e PUeuc SQUARE e CLEVELAND. OHto 44101 e TELEPHONE (216) 6231350 e UAIL ADDRESS: P. O. SDX 5000 Servmg The Best Location on :ne Nation Dafwyn R.Davidson vrCE PRESIDENT SYSTEM ENGINEERING AND CONSTRUCricN 1% g g
April 3, 1981 9'
/
/"dV6 N
q,
=
d AT'!i06 381> d.
Mr. Robert L. Tedesco Assistant Director for Licensing
$ v.s. %,y f,
'/A
"
- 8801 M?/
Division of Licensing U.S. Nuclear Regulatory Cc -ission
\\Q,
/ N' 9
'4ashington, D.C. 20555
/
Re:
Perry Nuclear Power Plant Units 1 and 2 Docket Nos. 50-WO; 50-W1
Dear Mr. Tedesco:
In response to your request for additional infor:ation dated March 20, 1981, we provide the following infor=ation.
The Ferry Fire Protection Evaluation Report (tra:t) was originally submitted on Septe=ber 26, 1977 and Revision 1 to the report on January 28, 1981. The FFER describes the detailed design as of Dece=ber 1979, which conforns to the intent of.the guidelines in BIP-APCSB 9.5-1, Appendix A.
Included is a fire ha::ards annlysis which evaluates the potential adverse effects of a fire on the ability to safely shut down the plant. Also provided in the report are layout drawings which show the safe shut down equip =ent and cabling, fire barriers and fire suppression equip =ent.
The specific information you requested w.ll be tabulated for inclusion in the next revision of the FFin.
'de expect to have this available for our review by May 15 and sub=itted to your office before June 19, 1981.
If you require any additional infor=ation, please let me know.
Very truly yours, Dalwyn Davidson Vice President System Engineering and Construction DRD: dip cc:
G. Charnoff D. Hauser J. Hu6 es, Resident Inspector h
(
8184 o ro g