Forwards Revised Description of Breakwater Continuous Monitoring Program Reflecting NRC & Util Mods.Program Has Been Initiated Per Described Schedule
ML20003E581
Person / Time
Site: Pilgrim
Issue date: 03/30/1981
From: Morisi A
BOSTON EDISON CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
81-67, NUDOCS 8104060496
Download: ML20003E581 (2)


Text

\

o' BOSTON EDISON COMPANY GENEsAL QFricts 800 GovtsTow STesty SusTON. M As s ACHus ETTs Q219 9 A. V. M O Rt S t NUCLEAR OPERATI N SUPPORT DEPARTMENT BECo. Ltr. #81-67 March 30 ,

Q

,, s )

Mr. Thomas A. Ippolito, Chief ((

Operating Reactors Branch #3 '5 Division of Operating Reactors  ! m- ffR0 3ggginPh3-Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Connission h3%'. g g [

Washington, D. C. 20555 f

.)

License No. DPR-35 Docket No. 50-293

Dear Mr. Ippolito:

In your letter dated February 3,1981, you transmitted your comments and proposed modifications to the Pilgrim Station Breakwater Continuous Monitoring Program, which we submitted to you on December 5,1980 (BECo. Ltr. #80-311).

Your proposed changes and our revisions to them were discussed and resolved by Mr. M. Williams of your staff and fir. J. Fulton of our Licensing Group during a telephone conference on March 19, 1981.

We have revised the PNPS Breakwater Monitoring Program to reflect the agreed upon changes, and resubmit it as Attachment "A" to this letter. We are confident that this resolution is acceptable to you and therefore have initiated the Pil-grim Station Breakwater continuous Monitoring Program per the described schedule.

Thank you for your assistance in resolving this issue.

Very truly yours, t

. N#55'/

AVM/rjb hool s

//

S104060 % %

P

. t .

Attachment A Breakwater Continuous Monitoring Program Description Photographs will be taken of points along the breakwater from permanently established benchmarks on the shoreline. These photographs will affirm the position of each visible lee side stone.

On an annual basis, after the winter storm season (on or closely following April 1), a complete set of photographs will be taken from the existing photo points on-the shoreline. These photographs will be compared to the originals to detect any major damage or movement.

In addition, aerial photographs will be taken at the same scale as the ones that were included in BEco's April 10, 1980 response to the NRC's questions concerning the breakwater. A comparison similar to that described above will be performed with these.

Upon identification of any damage to the breakwater, the NRC Project Manager and/or the Chief of the Hydrologic and Geotechnical Engineering Branch will be notified and repairs will be implemented as soon as possible. These repairs will be conducted under the surveillance of BECo's Quality Assurance Department.

The NRC. Project Manager and/or the Chief of the Hydrologic and Geotechnical Engineering Branch will be notified upon completion of repair .

These same procedures will be undertaken as soon as possible following a storni or a hurricane when onshore winds are in excess of 50 mph for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> as meas-ured at the site. The Environmental and Radiological Health and Safety Group shall monitor storm severities and notify the Nuclear Enaineerina Civil Struc-tural- Group, when the storm criteria has been met and a survey required.

The NRC Project Manager. and/or the Chief of the Hydrologic and Geotechnical Eng-ineering Branch will be notified as soon as possible when a survey has been init-iated.

The documented findings of all surveys conducted during the previous year will be submitted.to the NRC annually.

,,