0

~.4 ' ~

g)_ ^

TN

@Np

[4 nomw.msnmunes v.w wrer w "* * *""

  • P o Box 270 Es NMsYNbe W

HNoRD. CoNNECWWO1

.'..s,......-.L"JlT'%%%Z L,

-[

bg g

2

%?

March 20, 1981 Docket No. 50-2h5 A01203 Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.

20555

References:

(1)

W. G. Counsil letter to D. M. Crutchfield, dated October 16, 1980.

(2)

W. G. Counsil letter to D. G. Eisenhut, dated October 24, 1980.

(3)

W. G. Counsil letter to D. G. Eisenhut, dated December 15, 1980.

(4)

W. G. Counsil letter to D. G. Eisenhut, dated January 21,1981.

(5)

D. G. Eisenhut letter to All BWR Licenseco, dt.ted December 9,1980.

Gentlemen:

Millstone Nuclear Power Station, Unit No.1 BWR Scram Discharge System In Reference (2), Northeast Nuclear Energy Company (NNEC) committed to re-evaluate the Millstone Unit No.1 scram discharge system against the evaluation criteria developed by the BWR Owners' Group Ad-Hoc Committee on I&E Bulletin No. 80-17, and to submit the results of this reevaluation, along with a schedule for implementation of any required modifications, by December 15, 1980. However, in Reference (3), based upon the fact that NNEC0 believed a NRC Generic Safety Evaluation Report (SER) regarding BWR scram discharge systems was being transmitted to all BWR licensees, NNECO felt it would be more appropriate to perform the above-mentioned reevaluation after reviewing the NRC Staff's positions represented in the Generic SER. Therefore, NNECO proposed to submit the results of the reevaluation, along with a schedule for implementation of any required modifications, by January 15, 1981. Since the Generic SER was not received in time to allow a response by this date, NNECO proposed in Reference (4) to submit the above-mentioned information to the NRC Staff within thirty (30) days after receipt of the Generic SER.

Therefore, this letter is in response to Reference (5), which NNECO officially received from the NRC on February 9, 1981.

The Millstone Unit No.1 scram discharge system was evaluated against the evaluation criteria developed by the BWR Owner's Group. The NRC's acceptance h

8103 27073g

. criteria specified in Reference (5) were utilized in NNEC0's evaluation.

The following represents the results of this evaluation as well as those long-tem modifications which are necessary to ecmply with the B'n3 Owner's Group evaluation critaria.

Inplementation of these modifications is presently scheduled for the next refueling outage.

Functional Criterion 1:

The scram discharge volume shall have sufficient capacity to receive and contain water exhausted by a full reactor scram without adversely affecting control rod drive scram performance.

Comment:

The scram discharge volume must be enlarged to ec= ply with the 3.34 gallons per drive requirement.

Safety Criterion 1:

No single active failure of a component, or service function shall preient a reactor scram, under the most degraded conditions that are operationally acceptable.

Comment:

Millstone Unit No.1 presently meets this criterion since the worst single active failure, i.e. a scram valve failure, will result in one control rod not inserting.

Safety Criterion 2:

No single active failure shall prevent uncontrolled loss of reactor coolant.

Comment:

In order to meet this criterion, motor operated block valves must be installed in series as a backup to the existing air operated valves on the vent and drain lines.

Safety Criterion 3:

The scram discharge system instrumentation shall be designed to provide redundancy, to operate reliably under all conditions, and shall not be adversely affected by hydrodynamic forces or flow characteristics.

7

+

. l Coc: ment :

The instrument volume level instru=entation presently initalled consists of six switches:

h at hi/hi (39 gallons) level 1 at hi (18 gallons) level 1 at (3 gallons) level

'Ibe hi/hi level alam and scram functions derive fro = a one-out-of-two-taken-twice logic. However, the system is configured as a singly piped system.

Hydrodynemic and flow forces have not adversely affected the instrument volu=e level floats. Millstone Unit No.1 does not use the floats which vere found in some S'R's to have venting problems, nor does the unit utilize the design which was suspected to cause large flow rates and/or vater ha==er.

Since the concern for ccc:=en-cause failures of the scram level instrumentation has been added to the 5'R Owner's Group evaluation criteria by the ERC, further evaluation ~of ccemon-cause failures is necessary to deter =ine what modifications, if any, are required.

Safety Criterion h:

System operating conditions which are required for scram shall be continuously monitored.

Consne nt :

Qe Safety Criterion 3 Safeti Criterica 5:

Repair, replacement, ad,just=ent, or surveillance of any system ccx::ponent shall not require the scram function to.be bypassed.

Canment :

Procedures for the presc%1y installed instrument ve'.u=e level switch systems exist which meet this criturion by implementing hal:-scram in acccrdance with the technical specifications.

Operational Criterion 1:

Level instrumentation shall be designed to be maintained, tested, or calibrated during plant operation without causing a scram.

Consnent :

This criterion is currently satisfied on a monthly basis in regard to the instrument volume level instrumentation.

4 L

_h_

Operational Criterion 2:

The systes shall include sufficient supervisory instru=entation and alar =s to permit surveillance of system operation.

M ent:

The system, as codified during the present refueling outage, alar =s on high instru=ent volu=e level, and lov instru=ent air pressure. These alar =s give the operator sufficient varning of any potentiel problem.

Operational Criterion 3:

The system shall be designed to minimize the exposure of operating personnel to radiation Comment :

The syste= is designed so that it can be periodically hydrolased to reduce radiation levels in keeping with ALARA. The hydraulic control centers are located below the scra= discharge header in a low radiation field. Access to the instrument volu=e is barred by locked gates and a radiation vork permit is required for entry into these areas.

Operational Criterion h:

Vent paths shall be provided to assure adequate drahage in preparation for scram reset.

Comment:

The vents are open to atmosphcre and the piping is either horizontal or sloping toward the open end or back to the discharge header. There are no loop seals in the piping run.

Operational Criterion 5:

Vent and drain functions shall not be adversely affected by other system interfaces. The objective of this requirement is to preclude water backup in the scram instru=ent volume which could cause spurious scra=.

Comment:

As stated above, the vents are open to atmosphere and not connected to any other system. The drain is connected to the Reactor Building Drain Tank (REDT).

Other systems also drain to the RBDT. The REDT is vented to atmosphere and is below the instrument volume. If water vere to back up the drain line, !+

vould spill out of floor drains at elevations below the instrunent volu::.e before it could begin to fill the volume.-

5_

Design Criterion 1:

The scram discharge headers shall be sized in accordance with GE OER-54 and shall be hydraulically coupled to the instru=ented volume (s) in a manner to permit operability of the scram level instrumentation prior to loss of system function. Each system shall be analyzed based on a plant-specific maximum inleakage to ensure that the system function is not lost prior to initiation of automatic scram. Maximum inleakage is the maximum flow rate through the scram discharge line without control rod motion su==ed over all control rods.

The analysis should show no need for vents or drains.

Comment:

The two inch pipe which connects the discharge volu=e with the instrument volume on the north side of the reactor building must be replaced with a six inch pipe. On the south side of the reactor building a new instrument volume with a six inch connection to the discharge volume and associated drain piping must be installed. The yet to be installed instrument volume vill comply with the applicable B'n'R Owners' Group evaluation criteria.

Design Criterion 2:

Level instrumentation shall be provided for automatic scram initiation while suffic ant volume exists in the scram discharge volume.

Comment:

See Functional Criteria 1, Safety Criteria 3, and Design Criteria 1.

Design Criteria 3:

Instrumentation taps shall be provided on the vertical instrument volume and not on the connected piping.

Comment:

The level taps are. located on the instrument volume.

Design Criterion 4:

The scram instrumentation shall be capable of detecting vater accumulation in the instrumented volume (s) assuming a single active failure in the in-strumentation system or the plugging of an instrument line.

Comment:

The scram instrumentation on the instrument volume is redundant.

See also Safety Criterion 3.

Design Criterion 5:

Structural and component design shall consider loads and conditions including those due to fluid dynamics, themal expansion, internal pressure, seismic considerations, and adverse environments.

Ccament :

Adaitional supports have been added to the scram discharge system piping based upon re-analysis of the system which considered applicable loads and conditions.

Design Criterion 6:

The power-operated vent and drain valves shall close under loss of air and/or electric power. Valve position indication shall be provided in the control rocm.

Comment:

These valves close on loss of air and their position is indicated in the control roca.

Design Criterion 7:

Any reductions in the system piping flow path shall be analyzed to assure system reliability and operability under all modes of operation.

Comment :

See Design Criterion 1.

Design Criterion 8:

System piping geometry (i.e., pitch, line size, orientation) shall be such that the system drains continuously during normal plant operation.

Comment:

Piping from the header to the instrument volume is continually sloped downward to allow for proper drainage. Piping frca the instrument volume to the REDT is either horizontal or sloped to the RBDT with no loop seals in the line.

Design Criterion %

Instrumentation shall be provided to aid the operator in the detection of water accumulation in the instrumented volume (s) prior to scram initiation.

u_

.' Coment :

Instrumentation is provided to perform this function.

Design Criterion 10:

Vent and drain line valves shall be provided to contain the scru discharge water, with a single active failure and to minimize operational exposure.

Coment :

Vent and drain line valves are presently provided, however, these valves are not redundant. An additional valve in series with each of the existing valves will be added to meet this criterion. See also Safety Criterion 2.

Surveillance Criterion 1:

~

Vent and drain valves shall be pariodically tested.

Coment :

Proposed technical specification changes w e submitted to the NRC Staff in Reference (1) which require that the vent and drain valves be verified open at least once per month. The proposed changes also require that these valves be verified, at least once per operating cycle, to close in less than 30 seconds after receipt of a signal for control rods to scram, and to open when scram signal is reset and when scram discharge volume trip is bypassed.

Surveillance Criterion 2:

Verifying and level detection instrumentation shall be periodically tested in place.

i Coment :

Functional tests of the scram level instrumentation are already required per technical-specifications.. However, plant procedures may need to be changed.

l Surveillance Criterion 3:

The operability of the entire system as an integrated whole shall be demonstrated periodically and during each operating cycle, by demonstrating scram instrument response and valve function at pressure and temperature at.approximately 50%

control rod density.

Comment:

At least once during each operating cycle,- the operability of the system will be demonstrated by verifying that after the unit scrams, the instrument volume level

1 i

- instru=entatica trips occur, the vent and drain valves close, the syste: can bo reset, and the sy? +.- drains adequately. The unit vill not 1e scra=ned for t'.e r

sole purpose of dm ;.strating the operability of the ecran discharge systen.

k*e trust that the above adequately addresses i:iE00's cenpliance with the Fe.

Owners' Group evaluation criteria.

2.iFf0 vill proceed on the basis that the above modifications are acceptable to the EC unless otherwise indicated by the EC.

Should you have any questions, please feel free to contact us.

Very truly yours, fiORFMT ECLD.R EiEGY COMP /diY i) / ~

/.

f 7!7 tat V. Cr.' Counsil Senior Vice President

.