ML20003D586
| ML20003D586 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 03/24/1981 |
| From: | Lippold W BALTIMORE GAS & ELECTRIC CO. |
| To: | Clark R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20003D587 | List: |
| References | |
| NUDOCS 8103270706 | |
| Download: ML20003D586 (1) | |
Text
l
..1 B ALTIMORE G AS AND ELECTRIC COMP ANY P O. Box !47s B A LTs u o R E. M A R Y L A N D 212o 3 Md!"On 24,1931 NUCLEAR poser DEPARTutMT jjW' 04Lvta? CLa rF5 wuCLEa m *c eta *L A=T O
e us.v.... vb.~o un Offe e of Nuclear Reactor Regulatim b gf G
U. S. Nuclear Regulatory Commission Sg ! JAR 3 g
'g Washington, D. C. 20555 q
ATTENTION:
Mr. R. A. Clark, Chief DuT*\\[,!
"^
Operating Reactors Branch #3 Division of Licensing
%\\
SUBJECT:
Calvert Cliffs Nu. lear Power Plant Unit No. 2, Docket No. 50-318 Correction to Technical Specification Figure 2.2-3 REFERENCE (A):
A. E. Lundvall to R. A. Clark letter dated 12/4/30. Unit 2 Fourth Cycle License Application (B):
R. A. Clark Io A. E. Lundvall letter dated 2/10/31, Amendment No. 31 to License No. DPR-69 Gentlemen:
Section 9.0 of Reference (A) contains an oversight in that item 7 of Table 9-1 should have made reference to a new Technical Specification Figure 2.2-3. That new Figure 2.2-3 is attached. Please note that the PVAR equation on Figure 2.2-3 is mocified to agree with the equation on Technical Specification Figure 2.2-2 centained in Reference (B).
The Safsty Analyses reported in Reference (A) used the correct PVAR equation.
Also, TM/LP LSS Setpoints for Cycle 4 were determined using the correct equation.
Consequently, the present Safety Analyses and TM/LP LSS Setpoints have been and still are valid.
Very truly yours,
- 3. Lippo, upervtsor Nuc!c Fuel Management WJL/djw Attachment Copies To:
- 3. A. Biddison, Esquire G. F. Trowbridge, Esquire Messrs.
E. L. Conner, Jr. - NRC P. W. Kruse - CE 6
y 810s2ioyog