E ABNOR.vf4 OCCURRENCE REPORT Big Rock Point 1.
Report No A0-13-Th, Docket 50-155 2A.
Occurrence Dates - May h, 197h and May 5, 1974.
2B.
Report Date - May 15, 197h.
3.
Facility - Big Rock Point Plant.
4.
Identification - Control rod drive withdraw timing less than 23 seconds.
5 Conditions prior to occurrence - Plant in hot standby to conduct rod drive withdraw timing tests as committed in letter of Sewell to O' Leary on May 1, 1974.
6.
Description of Occurrence - During timing test on the rod drive system 6 control rod drives were found to withdraw at less than 23 seconds with. primary system at approximately 380 F.
These were readjusted and timed at greater than 25 seconds. The drives were again tested at approximately 550 F and one of the same drives again withdrew in less than 23 seconds. This drive was again adjusted and retimed at greater than 25 seconds. Plant heatup was then continued.
7 Analysis of Occurrence - Our analysis and hazards considerations remain as outlined in the aforementioned letter of May 1, 1974.
8.
Designation of Cau'se - Probable design deficiency in drive hydrau-lic system but exact cause remains unknown.
9 Corrective Action - The drives were adjusted and retimed in the hot condition. Future testing is being considered to isolate the cause. Permanent corrective actions vill be as outlined in the Sewell/O' Leary letter of May 1, 1974.
10.
Failure Data - Refer to A0-3-74 submitted April 3, 1974.
Tl03270&7 f
\\
a
AEC D' 7tI EPTT G:: FO?_ _PAFT 59_ FCYJ.T l'/ ' 7I AL (TL:!PORARY l'OM)
CO:; TROL NO: td33_
FILE:[ d FRO:::
DATE CP DOC DATE REC'D LTR l'A '.O PIT 07 5
~
Connsners Power Company J:ckson, MI.
5-6-74 5-9-74 IWX R. B. Sewell 70:
~
J. F. O' Leary 1
SENT LOCAL PDJ J CLAS UNCIASS PROP INPO INPUT NO CYS REC'D DOCKET NO:
XXX 1
50-155 DESCRIPTION:
ENGLOSURLG:
TWX reporting abnorma1' occurrence on 5-4-74, in which the control rod drive withdraw timing ACKNOWLEDGED 12ss than 23 seconds..........
.D0 NOT REMOVE PLANT NAME: Big Rock FOR ACTW:/I' :L STICC 5 _9_2/2 r.c EUTLER(L)
SCIMENCER(L)
/IE':!J!N(L)
REGA"(E)
W/ Copico W/ Copics W/ 7 Copies W/ Copies CLAFX(L)
S'.0LZ (L)
DICKER (E)
U/ Copies W/ Copics W/ Copics W/ Copies PAnR(L)
VASSALI.O(L)
KNIGHTON(E)
W/ Copics W/ Copies W/ copics w/ copics 12;IEL(L)
PUl!PLE (L)
YOU1:GELCOD(E)
W/ Copice U/ Copics W/ Copics W/ Copics 71:T7"?.L DISTiJ:.bfj 20 1 "
TEC:i i"/JII'1 D C.;TCJ A/T I"D 6C PDR VICNDRIE GRIhES LIC ASST nnA17;;fc:
SALIEUAN COC, POCi F-505A SC!rt0ZDER C/22:ILL v61 CGS (L) v/:UNTZIUG/ STAFFyM/.CC/JtY RAST;ER gnzgyg (t) r,.
E.T A ASE fNIG11T EALL*.RD COULBOURNE (L)
PI.tNS W1AMDUSSO v/PAWLICKI SPASGLER LEE (L)
MCDO::/.LD E0YD MO MAIGRTT (L)
DUCE v/Ince t MCORE (L)(E IR)
ATCLLO ENVIRO REED (E)
I DEYOUNG(L)(TUP.)
/00STON
!!ULLER SERVICE (L)
C. MM SROVHOLT (L) f 0VAX DICKER SilEPPARD (L)
EII0 (ElW~350)
/GOLLER(L)
AOSS 10?IGHTON S1.ATER (E)
E'.E M R P. COLLINS dPPOLITO YOUNGBLOOD SMITH (L)
DENISE dEDESCO REC /2i TEETS (L)
VEISENiiU T
/EGOPR 4.ONG PROJECT LDR WADE (E)
FILE & REGION (3)
W INAS WILLIAMS (E)
VIORRIS
/,EMA90YA
--l!ARLESS WILSON (L)
STEELE
/OLUIER w.
I?[.
EXTCRNAL DISTi_I!!UTION
/1 - LGOAL PDR _ _Charhyoix Mich ed - TIC (ABERNATily)
~
(1)(2):10)-NATIONAL LA3'S 1-PDR-SA'/LA/:1 a/l - NSIC(EUCi'.ANAN) 1-ASLBP(E/W Blda,nm 529) 1-GE"iLD LCI.LCUCP' 1 - ASLB 1-U. Pi:C:INGTO':, Rm E-201 GT LRCCX:2.VE:: NA1 L '.S 1 - P. R. DAVIS (AEROJET NUCLEAR) 1-CONSULTANT' S 1-ACMED(? d cr.2.
V16 - CYS ACRS ljtXDA10; SENT TO LIC ASST.
NE;.T/CJ:/ "LUMr./AGEABI/2?
FJi-B- 12 7. C"'.
5-9-74 DIGGS 1-GC;ALD UL~m3C",0!CL l-RD..NULLU.. F - F ~
1-B & M SWISEBROAD, Pc E-201 GT l
6 DESCRIPTIO!! 0F O( JRRENCE - DURING TIMING TE Otl THE ROD DRIVE SYSTEM 6 CONTROL ROD DRIVES WERE FOUND TO WITHDRAW AT LESS THAt!
23 SEC0t!DS WITH, PRIMARY SYSTEM AT APPROXIMATELY 380 DEGREES F.
THESE WERE READJUSTED At1D TIMED AT GREATER THAN 25 SEC0t1DS. THE DRIVES WERE AGAIN TESTED AT APPROXIMATELY 550 DEGREES F. Af!D ONE OF THE SA!'E DRIVES,AGAIN WITHDREW IN LESS THAN 23 SECONDS. THIS DRIVE WAS AGAIN ADJUSTED AND RETIMED AT GREATER THAtl 25 SECONDS.
PLAT!T HEATUP WAS THEN CONTINUED.
7.
At!ALYSIS OF OCCURRENCE - OUR ANALYSIS AND HAZARDS CONSIDERATI0tlS ret'AIt1 AS OUTLINED IN THE AFOREMEi!TIO!1ED LETTER OF MAY 1,1974.
8.
DESIGt!ATI0t! 0F CAUSE - PROBABLE DESIGN DEFICIENCY IN DRIVE HYDRAULIC SYSTEM BUT EXACT CAUSE REMAINS UNKNOWN.
9.
CORRECTIVE ACTION - THE DRIVES WERE ADJUSTED AND RETIMED IN THE NOT C0!)DITION. FUTURE TESTING IS BEING CONSIDERED TO ISOLATE THE CAUSE. PERMAf!ENT CORRECTIVE ACTIONS WILL BE AS OUTLINED IN THE SEWELL-0" LEARY LETTER OF MAY 1, 1974.
E' R B SEWELL NUCLEAR LICENSING ADMINISTRATOR C0t1SUMERS POWER COMPANY END - DU CC-J F 0" LEARY, USAEC, BETHESDA C J HARTMAt!, BIG ROCK POINT DID YOU RECEIVE OK PLS ACK IF YOU RECEIVED OK b l O 'b RXS RECD OK TNKS L
cv 1
runisLL RohD Okk JACV, SON, MI f,(x p
g n'X 517-787-1987
//
y'I o
e
/p.i z).. ' ' / /
C-b<
r:
'%' p$
5 z;:.
5-e-74 n.
Regulat0Ty Docket file t.y [' f-3 s e, ~
Ea ID-MR J G KEPPLER s.
DIRECTORATE OF REGULATORY OPERATIONS 3
?
REGION III, USAEC cv 799 ROOSEVELT ROAD cp g
GLEN ELLYN, IL
?$rfu j
NAYo e
f
- /
C ' p", f" Gl RE-DOCKET 50-155 61
'A LICENSE DPR-6
'k-L g;
THIS REPORT IS SUBMITTED TO FOLLOW UP OUR TELEPHONE CONVE MR E JORDON ON MAY 6,1974, 1.
REPORT NO A0-13-74 DOCKET 50-155 2./A/ OCCURRENCE DATES - MAY 4,1974 AND MAY 5, 1974 2./B/ REPORT DATE - MAY 6, 1974 3.
FACILITY - BIC ROCK POINT PLANT 4.
IDENTIFICATION - CONTROL ROD DRIVE WITHDRAW TIMING LESS THAN 23 SECONDS.
5.
CONDITIONS PRIOR TO OCCURRENCE - PLANT IN HOT STANDBY TO CONDUCT ROD DRIVE WITHDR AW TIMING TESTS AS COMMITTED IN LETTER OF SEWELL TO O' LEARY ON MAY 1,1974.
p